My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-08-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
08/02/2010
>
FULL PACKET_2010-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:18:43 PM
Creation date
7/29/2010 12:05:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
8/2/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C -1 <br />(rev. July, 2010) <br />OFF -SITE IMPROVEMENTS <br />Ordinance No. NS- <br />11 A -9 <br />Page 9 <br />Estimated <br />Entity <br />Funded Prior <br />Description of Improvement <br />Cost (2004 <br />Responsible <br />to Indicated <br />Dollars) <br />For <br />Triggering <br />Im rovement <br />Event Cash <br />1. Install a new traffic signal at Main/15t , <br />$200,000 <br />Owner <br />Building <br />including communication cable and <br />Permit <br />conduits to connect to the City's Traffic <br />Management Center, and striping. <br />2. Install a new traffic signal at <br />$200,000 <br />Owner <br />Building <br />Sycamore /151", including communication <br />Permit <br />cable and conduits to connect to the City's <br />Traffic Management Center, and striping. <br />3. Install a new traffic signal at Santa Ana <br />$200,000 <br />Owner <br />Building <br />Blvd. /French St., including communication <br />Permit <br />cable and conduits to connect to the City's <br />Traffic Management Center, and striping. <br />4. Construct landscaped median on <br />$100,000 <br />Owner <br />Building <br />Broadway at the Broadway/Parking <br />Permit <br />Structure egress. <br />5.a. Acquire necessary ROW for <br />$2,400,000 <br />Owner, <br />Final Map <br />roundabout at the intersection of 10th Street <br />unless City <br />and Sycamore. <br />undertakes per <br />section 5.1.1 <br />5.b. Construct roundabout at the <br />$600,000 <br />Owner <br />Building <br />intersection of 10th Street and Sycamore, <br />Permit <br />with 10th Street one -way EB, including <br />necessary striping, traffic signs, pedestrian <br />crosswalks and pedestrian refuge areas. <br />Right -of -way shall be acquired at S /W, S/E <br />and N/W corners by developer. <br />Ordinance No. NS- <br />11 A -9 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.