Laserfiche WebLink
12- ORA- 55- 6.8 -6.9 <br />EA: OH290 <br />District Agreement 12 -0624 <br />SCOPE SUMMARY <br />PACT Version 9.1 3.31 .08 <br />�*T_b��� <br />16 of 17 <br />c <br />o <br />O <br />U) <br />QQZ <br />J <br />Q <br />V <br />C <br />N <br />Z <br />5 <br />270 <br />Construction Engineering and General Contract <br />Administration <br />X <br />X <br />10 <br />Construction Staking Package and Control <br />X <br />15 <br />Construction Stakes <br />X <br />20 <br />Construction Engineering Work <br />X <br />25 <br />Construction Contract Administration Work <br />X <br />30 <br />Contract Item Work Inspection <br />X <br />35 <br />Construction Material Sampling and Testing <br />X <br />X <br />05 <br />Materials Sampling and Testing for Quality Assurance <br />X <br />10 <br />Plant Inspection for Quality Assurance <br />X <br />15 <br />Independent Assurance Sampling and Testing <br />X <br />20 <br />Source Inspection <br />X <br />40 <br />Safety and Maintenance Reviews <br />X <br />45 <br />Relief From Maintenance Process <br />X <br />55 <br />Final Inspection and Acceptance Recommendation <br />X <br />60 <br />Plant Establishment Administration <br />X <br />65 <br />Transportation Management Plan Implementation During <br />Construction <br />X <br />75 <br />Resource Agency Permit Renewal and Extension <br />Requests <br />X <br />80 <br />Long -Term Environmental Mitigation /Mitigation <br />Monitoring During Construction Contract <br />X <br />99 <br />Other Construction Engineering and General Contract <br />Administration <br />X <br />5 <br />285 <br />Contract Change Order Administration <br />X <br />5 <br />290 <br />Resolve Contract Claims <br />X <br />5 <br />295 <br />Accept Contract, Prepare Final Construction Estimate, <br />and Final Report <br />X <br />PACT Version 9.1 3.31 .08 <br />�*T_b��� <br />16 of 17 <br />