Laserfiche WebLink
2 <br />2 <br />9 <br />0 <br />3 <br />Exhibit D: Proposed Structure Improvements (“Work Plan”) <br />2301 North Westwood Avenue <br />Item Year Improvement <br />1 2025 Replace one rear vinyl slider window with new window that is compatible in <br />materials, design, and operation. Planning Division staff approval required prior to <br />issuance of Building permit. <br />2 2025 Trim exterior landscaping to expose and accentuate historic property features, such <br />as the high gable roofline and corner/ribbon windows, to ensure a clear view of the <br />primary (west and south) façades from the public right-of-way. <br />3 2025 Repaint exterior of residence with a historically-compatible color palette. <br />4 2026 Remove double security doors from the main entrance. Replacement doors require <br />Planning Division staff approval prior to installment. <br />5 2027 Change out exterior lighting for historically-appropriate lighting. Planning Division <br />staff approval required prior to installation. <br />6 2028 Remove and replace the double glass block window (south façade) with a period <br />appropriate window that is compatible in materials, design, and operation. Planning <br />Division staff approval required prior to issuance of Building permit. <br />7 2030 Replace non-original garage door with historically-compatible garage door, <br />approved by Planning Division staff prior to installation. <br />Exhibit D