My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 Purchase Order to Tolar Manufacturing Company for Bus Shelters and Related Amenities
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/20/2025
>
Item 17 Purchase Order to Tolar Manufacturing Company for Bus Shelters and Related Amenities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 5:33:04 PM
Creation date
5/14/2025 3:20:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Public Works
Item #
17
Date
5/20/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,.w <br />TOLAR <br />IMAN0FACTURIN0 <br />April 7, 2025 <br />Marlene Alcaraz <br />Right -Of -Way Coordinator <br />City of Santa Ana <br />20 Civice Center Plaza <br />Santa Ana, CA 92701 <br />Project: City of Santa Ana Branded Shelters -Sole Source <br />Dear Jason: <br />The transit shelters (Tolar Models 35835-03/37884-00) and bench (37824-111) were designed and fabricated for the City <br />of Carson in 2015/2016 by Tolar Manufacturing Company, Inc were fabricated based on designs that are our intellectual <br />property and contain many custom metal and gasket extrusions that are unique to us. This includes our muti-channel <br />horizontal extrusion and hidden hinge kiosk extrusion. The shelter also contains City of Santa Ana specific branding. The <br />bench within the shelter and throughout the City contains Santa Ana specific branding. <br />In addition, the solar -powered illumination system was designed exclusively for the project in concert with the engineers at <br />our vendor partner, Urban Solar Corporation. Based on the shelters described above, our outside professional engineer <br />performed the stamped and steeled structural calculations. <br />The project we recently quoted will be fabricated to the same specifications by our AWS welders and under the direction <br />of our rigid quality control processes. This allows the City of Santa Ana staff or their assignee to deal with one kit of <br />replacement parts, one type of solar power unit, and one method of repair. <br />Don't hesitate to contact me if you have any questions regarding this information. <br />Sincerely, <br />Patrick Digitally signed by <br />Patrick Merrick <br />Merrick Date: 2025.04.07 <br />13:05:40-07'00' <br />Patrick Merrick <br />Executive Vice -President <br />TOLAR MANUFACTURING COMPANY INC. <br />TRANSIT SHELTERS I STREET FURNITURE I DISPLAYS & DIRECTORIES I TRANSIT SOLAR LIGHTING <br />258 Mariah Circle, Corona, CA USA 92879-1751 1 800-339-6165 1 951-808-0081 1 www.tolarmfg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.