Laserfiche WebLink
First Street Multimodal Boulevard Study <br />May 20, 2025 <br />Page 2 <br />5 <br />0 <br />2 <br />2 <br />enhance transportation along First Street by assessing the feasibility of various <br />infrastructure improvements through extensive community outreach, field data analyses, <br />modeling, design, and environmental clearance with the intent of identifying and <br />designing a locally preferred alternative. The study will evaluate multimodal <br />improvements that promote the safety and transportation goals included in the City’s <br />recently adopted General Plan Mobility Element Update. <br />On February 18, 2025, City Council recognized the REAP funding in the amount of <br />$4,300,000 into the FY 2024-25 CIP and approved cooperative agreement between the <br />OCTA and the City of Santa Ana (Cooperative Agreement No. C-4-2053). This funding <br />will be utilized to cover the entirety of the recommended consultant agreement as well <br />as city staff time spent on the project, resulting in a net savings to the General Fund. <br />Request for Proposals (RFP) No. 25-029 was issued on February 25, 2025 on the City’s <br />online bid management and publication system, PlanetBids. A summary of vendor <br />participation and results is as follows: <br />832 Vendors notified <br />7 Santa Ana vendors notified <br />60 Vendors downloaded the RFP packet <br />5 Proposals received <br />1 Proposal received from Santa Ana vendor <br />Proposals were solicited, opened on March 25, 2025, and evaluated. A total of five <br />consultants submitted proposals. All proposals were reviewed by an evaluation <br />committee consisting of City of Santa Ana and OCTA staff and were rated based on <br />experience, qualifications, project understanding, schedule, past performance, and <br />references. The top three rated proposals were invited to interview on April 15, 2025. <br />Based on the scoring criteria outlined in the RFP, the following summarizes the ranking <br />of all responding firms: <br />Firm City Ranking <br />HDR Engineering, Inc.Irvine, CA 1 <br />Mark Thomas Irvine, CA 2 <br />Arcadis U.S., Inc.Irvine CA 3 <br />Kimley-Horn Orange, CA 4 <br />AYCE Santa Ana, CA 5 <br />Based on the proposal and interview evaluations, staff recommends awarding the <br />agreement to HDR Engineering, Inc. (HDR) to conduct the First Street Multimodal <br />Boulevard Study (Exhibit 1). HDR Engineering, Inc. is a global architecture, engineering, <br />environmental, and construction firm with over 150 transportation engineering and <br />planning staff in Southern California. In accordance with the RFP criteria, HDR <br />demonstrated a depth of experience working with similar-sized California public <br />agencies on multimodal corridor studies and design projects and put together a very