Laserfiche WebLink
First Street Multimodal Boulevard Study <br />May 20, 2025 <br />Page 4 <br />5 <br />0 <br />2 <br />2 <br />EXHIBIT(S) <br />1. Agreement with HDR Engineering, Inc. <br />2. HDR Engineering, Inc. Proposal <br />Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency <br />Approved By: Alvaro Nuñez, City Manager