My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JIG CONSULTANTS
Clerk
>
Contracts / Agreements
>
J
>
JIG CONSULTANTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 2:14:54 PM
Creation date
5/20/2025 2:08:13 PM
Metadata
Fields
Template:
Contracts
Company Name
JIG CONSULTANTS
Contract #
A-2025-018-05
Agency
Public Works
Council Approval Date
2/18/2025
Expiration Date
2/17/2028
Insurance Exp Date
9/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��e <br />j T,� CITY OF SANTA ANA <br />vi. Geotechnical Engineering Services <br />Conduct geotechnical investigations, including field explorations and tests, <br />laboratory tests, and seismic investigations, to assess the general conditions of a <br />project site area and prepare geotechnical reports of final design and construction <br />recommendations. Field explorations may require drilling plans and classification <br />of underlying soils and must be done under the supervision of a licensed <br />geotechnical engineer or registered geologist. Investigations may include slope <br />stability analysis of reservoir embankments, foundations, retaining walls, and <br />dams and earthen dam monitoring and inspection to comply with California <br />Department of Water Resources, Division of Safety of Dams (DSOD) and other <br />City requirements. Provide seismic hazard analyses and site -specific seismic <br />criteria, as needed, for project design. <br />vii. Hydroge000gy <br />Provide consulting services on groundwater issues related to and including <br />rehabilitation of existing potable water production wells, siting and design of new <br />potable water production wells, destruction of inactive wells, evaluation of <br />contamination plumes, and groundwater modeling. Evaluate the hydrogeology of <br />proposed potable water production well sites and investigate proposed wells. <br />Determine design parameters and requirements necessary to drill, operate, and <br />maintain proposed wells; proposed well construction (casing diameter, locations <br />of perforated intervals); and proposed operation of wells. Prepare Drinking Water <br />Source Assessment and Protection (DWSAP) plans for proposed potable water <br />production wells. <br />Provide inspection, hydrogeologic analysis and recommendations during new <br />potable water production well drilling and existing well destruction activities, <br />including, but not limited to, on site consulting geologists, geological sampling and <br />formation analysis, geophysical logging and interpretation, sieve analyses, final <br />well construction recommendations, and quality assurance and assistance in <br />achieving conformance with the construction specifications and applicable codes <br />and standards. <br />viii. Environmental Compliance Services <br />Provide consulting services for the preparation of environmental documents and <br />support studies to comply with California Environmental Quality Act (CEQA), which <br />may include an Initial Study, Negative Declaration, Mitigated Negative Declaration, <br />Addendum, or Environmental Impact Report, or Supplement or Subsequent EIR, <br />National Environmental Policy Act (NEPA) when complying with federal grants, <br />permit applications with support studies, aesthetic simulations, and other <br />environmental compliance tasks that may be needed. <br />EXHIBIT I - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.