My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLEINFELDER, INC. (8)
Clerk
>
Contracts / Agreements
>
K
>
KLEINFELDER, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 2:15:22 PM
Creation date
5/20/2025 2:09:09 PM
Metadata
Fields
Template:
Contracts
Company Name
KLEINFELDER, INC.
Contract #
A-2025-018-06
Agency
Public Works
Council Approval Date
2/18/2025
Expiration Date
2/17/2028
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3of3 <br />GPRS - GPR & E <br />Alpha Traffic Se <br />Pitcher Barrel Sampler <br />$25o/day <br />Rock Coring Equipment <br />$40/ft $500 min <br />Saw cut machine <br />$25o/day <br />SPT Energy Test Calibration <br />$20oo/day <br />Water Tank - External <br />$too/day <br />Work Lights <br />$too/night <br />Asphalt patch <br />$25/ea <br />Bentonite chips <br />$25/bag <br />Bits <br />$5o/ea <br />Cement/bentonite grout <br />$15/ft <br />Drums <br />$11o/ea <br />Gravel <br />$15/bag <br />Perf pipe - 3" <br />$ 5/ft <br />PVC - 2" screen <br />$10/ft <br />M <br />2 Hr Min <br />$700.00 <br />2 Hr Min PW <br />$975.00 <br />4 Hr <br />$1050.00 <br />4 Hr PW <br />$1,225.00 <br />8 Hr <br />$2,100.00 <br />8 Hr PW <br />$2,450.00 <br />�rvices, INC. <br />One (1) tech Crew (1 truck) - ST, eight (8) hours on -site <br />$1223 /day <br />One (1) tech Crew - OT <br />$143.50 <br />One (1) tech Crew - DT <br />$168.50 <br />Two (2) tech Crew (1 truck) - ST, eight (8) hours on -site <br />$2171 /day <br />Two (2) tech Crew - OT <br />$287.00 <br />Two (2) tech Crew - DT <br />$337.00 <br />Additional Tech (Flagger) - ST <br />$118.50 <br />Additional Tech - OT <br />$143.50 <br />Additional Tech - DT <br />$168.50 <br />Additional Traffic Control Truck <br />$275/day <br />Flashing Arrow Sign (FAS)* <br />$11o/day <br />Changeable Message Sign (CMS)* <br />$262.5/day <br />Fuel surcharge (for travel greater than 50 miles one-way) <br />$125.00 <br />Traffic Control Plan,11"x17" <br />$375/page <br />Traffic Control Plan, 241'x36" <br />$495/Page <br />Engineer's Stamp (all sizes) <br />$40o/page <br />Permitting assistance <br />$85.00 <br />Public works projects or projects receiving public funds are subject to Prevailing Wage laws. The above rates for <br />professional and administrative staff are for services not subject to prevailing wages. If during the term of this contract, <br />these services are reclassified as qualifying for prevailing wages, then we will provide hourly prevailing wage rates at that <br />time. <br />'Applies to all professional rates including but not limited to clvil, mechanical, chemical, electrical, geotechnical, and <br />environmental engineers; Industrial hygienists; geologists; hydrogeologists; hydrologists; and computer specialists. <br />Hourly rates assume that other direct costs will be billed and reimbursed by the client. Kleinfelder reserves the right to <br />adjust the fee schedule on projects where other direct costs are not reimbursed. <br />Refer to the attached Basis of Charges for additional fee schedule information <br />
The URL can be used to link to this page
Your browser does not support the video tag.