Laserfiche WebLink
verdantas <br />FEE SCHEDULE <br />METHOD $/TEST <br />Type B Joint Seals (Caltrans SS 51-2)................................................... <br />1,640 <br />Bearingplates(A536)............................................................................... <br />770 <br />REINFORCING STEELAND PRESTRESSING STRANDS <br />Rebar tensile test, <- up to No. 11 (ASTM A370).......................................... <br />70 <br />Rebar tensile test, a No. 14 & over (ASTM A370)...................................... <br />215 <br />Rebar bend test, up to No. 11 (ASTM A370)............................................... <br />70 <br />Rebar bend test, > No. 14 & over (ASTM A370)........................................ <br />215 <br />Resistance butt -welded hoops/bars, tensile test, <- up to No. 10 (CTM <br />670)......................................................................................................... <br />70 <br />Resistance butt -welded hoops/bars, tensile test, 2: No. 11 & over <br />(CTM 670)..................................................................................................... <br />90 <br />Mechanical rebar splice, tensile test, <_ up to No. 11 (CTM 670) ............... <br />70 <br />Mechanical rebar splice, slip test, <- up to No. 11 (CTM 670)..................... <br />45 <br />Mechanical rebar splice, tensile test, > No. 14 & over (CTM 670) ........... <br />215 <br />Mechanical rebar splice, slip test, a No. 14 & over (CTM 670)................. <br />215 <br />Headed rebar splice, tensile test, <- up to No. 11 (CTM 670) ..................... <br />70 <br />Headed rebar splice, tensile test, > No. 14 & over (CTM 670) ................. <br />215 <br />Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775/ <br />A934)........................................................ .................................. I............ <br />50 <br />Epoxy coated rebar/dowel continuity (Holiday) test <br />(ASTM A775/A934)................................................................................... <br />70 <br />Epoxy coated rebar flexibility/bend test, up to No.11 <br />(ASTM A775/A934).................................................................................... <br />50 <br />Prestressing wire, tension (ASTM A416).................................................. <br />190 <br />Sample preparation (cutting)...................................................................55 <br />ITEM <br />1/4 inch Grab plates ................................................. <br />1/4 inch Tubing (bonded).............................................................. 0.60 foot <br />1/4 inch Tubing (single) ..................................................................0.40 foot <br />3/8 inch Tubing, clear vinyl ...........................................................0.60 foot <br />4-Gas meter(RKI Eagle orsimilar)/GEM 2000 ................................140 day <br />Air flow meter and purge pump(200cc/min)..................................55 day <br />Box of 24 soil drive-sam pie rings ....................................................130 box <br />Brass sample tubes .................................................. <br />Caution tape (1000-foot roll) ................................... <br />Combination lock or padlock.. ................................ <br />Compressed air tank and regulator ......................... <br />Concrete coring machine (<_6-inch-dia)................... <br />Consumables (gloves, rope, soap, tape, etc.)......... <br />Core sample boxes ................................................... <br />Crack monitor Two -Dimensional ............................. <br />Crack monitor Thee -Dimensional ........................... <br />Cutoff saws, reciprocating, electric (Sawzallo) ....... <br />D-Meter Walking Floor Profiler ................................ <br />Disposable bailers .................................................... <br />Disposable bladders ................................................. <br />Dissolved oxygen meter ............................................ <br />DOT 55-gallon containment drum with lid .............. <br />Double -ring infiltrometer.......................................... <br />Dual -stage interface probe ....................................... <br />Dynamic Cone Penetrometer ................................... <br />Generator, portable gasoline fueled, 3,500 watts.... <br />Global Positioning System/Laser Range Finder....... <br />Handauger set .......................................................... <br />HDPE safety fence (<100 feet) ................................... <br />Hori ba U-51 water quality meter .............................. <br />Light tower (towable vertical mast)., ....................... <br />Magnehetic gauge ..................................................... <br />Manometer................................................................ <br />Mileage (will adjust with IRS published rate)........... <br />METHOD $/TEST <br />STREET LIGHTS/SIGNALS <br />LED Luminaires / Signal Modules/ Countdown Pedestrian Signal Face <br />Modules (Caltrans RSS 86)................................................................ 1,390 <br />SPRAY APPLIED FIREPROOFING <br />Unitweight(density, ASTM E605).............................................................. <br />65 <br />FASTENERS/BOLTS/RODS <br />F3125 GR A307, A325 Bolts, tensiletest, <- up to 1-1/4" diameter, plain <br />(ASTM A370)............................................................................................ <br />70 <br />F3125 GR A307, A325 Bolts, tensile test,15 up to 1-1/4" diameter, <br />galvanized (ASTM A370)......................................................................... <br />80 <br />A490 Bolts, tensile test, 5 up to 1-1/4" diameter, plain (ASTM A370)....... <br />70 <br />A490 Bolts, tensile test, 5 up to 1-1/4" diameter, galvanized <br />(ASTM A370)-.............................................................................................. <br />80 <br />A593 Bolts, tensile test, s up to 1-1/4" diameter, stainless steel (ASTM <br />A370)........................................................................................................ <br />70 <br />F1554 Bolts, tensile test, < up to 1-1/4" diameter, plain (ASTM A370) ... <br />110 <br />F1554 Botts, tensile test, 5 up to 1-1/4" diameter, galvanized ( <br />ASTMA370).......................................................................................... 130 <br />SAMPLETRANSPORT <br />Pick-up and delivery (weekdays, per trip, <br /><50 mile radiusfrom ouroffice)....................................................... 110 <br />EQUIPMENT LIST <br />$ UNIT <br />5 each <br />................. 11 each <br />................. 22 each <br />................. 15 each <br />................. 55 day <br />............... 160 day <br />................ 40 day <br />................ 30 each <br />................ 30 each <br />................ 40 each <br />......... I...... 80 day <br />.............. 110 day <br />................ 25 each <br />................ 20 each <br />................ 50 day <br />................ 85drum <br />.............. 135 day <br />................ 85 day <br />.............. 430 day <br />................ 90 day <br />................80 day <br />................ 90 day <br />................40 roll <br />.............1135 day <br />.............. 150 day <br />................ 15 day <br />................ 25 day <br />............. 0.67 mile <br />ITEM $ UNIT <br />Moisture test kit (excludes labor to perform test, ASTM E1907) ..... 65 test <br />Nuclear moisture and densitygauge...............................................88 <br />day <br />Electrical moisture and density gauge ............................................ <br />88 <br />Day <br />Pachometer.......................................................................................50 <br />day <br />Particulate Monitor......................................................................... <br />135 <br />day <br />pH/Conductivity/Temperature meter..............................................60 <br />day <br />Photo -Ionization Detector (PID)..................................................... <br />130 <br />day <br />Pump, Typhoon 2 or 4 stage .............................................................55 <br />day <br />QED bladder pump w/QED control box..........................................175 <br />day <br />Quire fee- Phase I only ........................ ........................................... <br />250each <br />Resistivity field meter and pins......................................................200 <br />day <br />Slip / threaded cap, 2-inch or4-inch diameter, PVC Schedule 40... <br />20 each <br />Slope inclinometer.......................................................................... <br />250 <br />day <br />Soil sampling T-handle (Encore) .......................................................10 <br />day <br />Soilsampling tripod..........................................................................40 <br />day <br />Speedy(R)moisture tester............................................................... <br />10 <br />day <br />Stainless steel bailer.......................................................................... <br />60 <br />day <br />Submersible pump with controller ................................................ <br />180 <br />day <br />Submersible pump/transfer pump, l0-25gpm...............................65 <br />day <br />Support service truck usage (well installation, etc.) .....................250 <br />day <br />Survey/fence stakes.......................................................................... <br />10 each <br />Ted lar® bags...................................................................................... <br />25 each <br />Traffic cones (<_25)/barricades(singletane).....................................55 <br />day <br />Turbiditymeter.................................................................................80 <br />day <br />Tyvek® suit (each).............................................................................. <br />25 each <br />Vapor sampling box...........................................................................65 <br />day <br />Vehicle usage (carrying equipment) ................................................. <br />20 <br />hour <br />VelociCalc..........................................................................................40 <br />day <br />Visqueen (20 x 100 feet).................................................................. <br />130 <br />roll <br />Water level indicator (electronic well sounder) <300 feet deep we11100day <br />ZIPLEVEL®........................................................................................... <br />40 <br />day <br />Other specialized geotechnical and environmental testing and <br />monitoring equipment are available, and priced per site <br />Fee 2024 www.verdantas.com Page 3 of 4 <br />