verdantas
<br />FEE SCHEDULE
<br />METHOD $/TEST
<br />Type B Joint Seals (Caltrans SS 51-2)...................................................
<br />1,640
<br />Bearingplates(A536)...............................................................................
<br />770
<br />REINFORCING STEELAND PRESTRESSING STRANDS
<br />Rebar tensile test, <- up to No. 11 (ASTM A370)..........................................
<br />70
<br />Rebar tensile test, a No. 14 & over (ASTM A370)......................................
<br />215
<br />Rebar bend test, up to No. 11 (ASTM A370)...............................................
<br />70
<br />Rebar bend test, > No. 14 & over (ASTM A370)........................................
<br />215
<br />Resistance butt -welded hoops/bars, tensile test, <- up to No. 10 (CTM
<br />670).........................................................................................................
<br />70
<br />Resistance butt -welded hoops/bars, tensile test, 2: No. 11 & over
<br />(CTM 670).....................................................................................................
<br />90
<br />Mechanical rebar splice, tensile test, <_ up to No. 11 (CTM 670) ...............
<br />70
<br />Mechanical rebar splice, slip test, <- up to No. 11 (CTM 670).....................
<br />45
<br />Mechanical rebar splice, tensile test, > No. 14 & over (CTM 670) ...........
<br />215
<br />Mechanical rebar splice, slip test, a No. 14 & over (CTM 670).................
<br />215
<br />Headed rebar splice, tensile test, <- up to No. 11 (CTM 670) .....................
<br />70
<br />Headed rebar splice, tensile test, > No. 14 & over (CTM 670) .................
<br />215
<br />Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775/
<br />A934)........................................................ .................................. I............
<br />50
<br />Epoxy coated rebar/dowel continuity (Holiday) test
<br />(ASTM A775/A934)...................................................................................
<br />70
<br />Epoxy coated rebar flexibility/bend test, up to No.11
<br />(ASTM A775/A934)....................................................................................
<br />50
<br />Prestressing wire, tension (ASTM A416)..................................................
<br />190
<br />Sample preparation (cutting)...................................................................55
<br />ITEM
<br />1/4 inch Grab plates .................................................
<br />1/4 inch Tubing (bonded).............................................................. 0.60 foot
<br />1/4 inch Tubing (single) ..................................................................0.40 foot
<br />3/8 inch Tubing, clear vinyl ...........................................................0.60 foot
<br />4-Gas meter(RKI Eagle orsimilar)/GEM 2000 ................................140 day
<br />Air flow meter and purge pump(200cc/min)..................................55 day
<br />Box of 24 soil drive-sam pie rings ....................................................130 box
<br />Brass sample tubes ..................................................
<br />Caution tape (1000-foot roll) ...................................
<br />Combination lock or padlock.. ................................
<br />Compressed air tank and regulator .........................
<br />Concrete coring machine (<_6-inch-dia)...................
<br />Consumables (gloves, rope, soap, tape, etc.).........
<br />Core sample boxes ...................................................
<br />Crack monitor Two -Dimensional .............................
<br />Crack monitor Thee -Dimensional ...........................
<br />Cutoff saws, reciprocating, electric (Sawzallo) .......
<br />D-Meter Walking Floor Profiler ................................
<br />Disposable bailers ....................................................
<br />Disposable bladders .................................................
<br />Dissolved oxygen meter ............................................
<br />DOT 55-gallon containment drum with lid ..............
<br />Double -ring infiltrometer..........................................
<br />Dual -stage interface probe .......................................
<br />Dynamic Cone Penetrometer ...................................
<br />Generator, portable gasoline fueled, 3,500 watts....
<br />Global Positioning System/Laser Range Finder.......
<br />Handauger set ..........................................................
<br />HDPE safety fence (<100 feet) ...................................
<br />Hori ba U-51 water quality meter ..............................
<br />Light tower (towable vertical mast)., .......................
<br />Magnehetic gauge .....................................................
<br />Manometer................................................................
<br />Mileage (will adjust with IRS published rate)...........
<br />METHOD $/TEST
<br />STREET LIGHTS/SIGNALS
<br />LED Luminaires / Signal Modules/ Countdown Pedestrian Signal Face
<br />Modules (Caltrans RSS 86)................................................................ 1,390
<br />SPRAY APPLIED FIREPROOFING
<br />Unitweight(density, ASTM E605)..............................................................
<br />65
<br />FASTENERS/BOLTS/RODS
<br />F3125 GR A307, A325 Bolts, tensiletest, <- up to 1-1/4" diameter, plain
<br />(ASTM A370)............................................................................................
<br />70
<br />F3125 GR A307, A325 Bolts, tensile test,15 up to 1-1/4" diameter,
<br />galvanized (ASTM A370).........................................................................
<br />80
<br />A490 Bolts, tensile test, 5 up to 1-1/4" diameter, plain (ASTM A370).......
<br />70
<br />A490 Bolts, tensile test, 5 up to 1-1/4" diameter, galvanized
<br />(ASTM A370)-..............................................................................................
<br />80
<br />A593 Bolts, tensile test, s up to 1-1/4" diameter, stainless steel (ASTM
<br />A370)........................................................................................................
<br />70
<br />F1554 Bolts, tensile test, < up to 1-1/4" diameter, plain (ASTM A370) ...
<br />110
<br />F1554 Botts, tensile test, 5 up to 1-1/4" diameter, galvanized (
<br />ASTMA370).......................................................................................... 130
<br />SAMPLETRANSPORT
<br />Pick-up and delivery (weekdays, per trip,
<br /><50 mile radiusfrom ouroffice)....................................................... 110
<br />EQUIPMENT LIST
<br />$ UNIT
<br />5 each
<br />................. 11 each
<br />................. 22 each
<br />................. 15 each
<br />................. 55 day
<br />............... 160 day
<br />................ 40 day
<br />................ 30 each
<br />................ 30 each
<br />................ 40 each
<br />......... I...... 80 day
<br />.............. 110 day
<br />................ 25 each
<br />................ 20 each
<br />................ 50 day
<br />................ 85drum
<br />.............. 135 day
<br />................ 85 day
<br />.............. 430 day
<br />................ 90 day
<br />................80 day
<br />................ 90 day
<br />................40 roll
<br />.............1135 day
<br />.............. 150 day
<br />................ 15 day
<br />................ 25 day
<br />............. 0.67 mile
<br />ITEM $ UNIT
<br />Moisture test kit (excludes labor to perform test, ASTM E1907) ..... 65 test
<br />Nuclear moisture and densitygauge...............................................88
<br />day
<br />Electrical moisture and density gauge ............................................
<br />88
<br />Day
<br />Pachometer.......................................................................................50
<br />day
<br />Particulate Monitor.........................................................................
<br />135
<br />day
<br />pH/Conductivity/Temperature meter..............................................60
<br />day
<br />Photo -Ionization Detector (PID).....................................................
<br />130
<br />day
<br />Pump, Typhoon 2 or 4 stage .............................................................55
<br />day
<br />QED bladder pump w/QED control box..........................................175
<br />day
<br />Quire fee- Phase I only ........................ ...........................................
<br />250each
<br />Resistivity field meter and pins......................................................200
<br />day
<br />Slip / threaded cap, 2-inch or4-inch diameter, PVC Schedule 40...
<br />20 each
<br />Slope inclinometer..........................................................................
<br />250
<br />day
<br />Soil sampling T-handle (Encore) .......................................................10
<br />day
<br />Soilsampling tripod..........................................................................40
<br />day
<br />Speedy(R)moisture tester...............................................................
<br />10
<br />day
<br />Stainless steel bailer..........................................................................
<br />60
<br />day
<br />Submersible pump with controller ................................................
<br />180
<br />day
<br />Submersible pump/transfer pump, l0-25gpm...............................65
<br />day
<br />Support service truck usage (well installation, etc.) .....................250
<br />day
<br />Survey/fence stakes..........................................................................
<br />10 each
<br />Ted lar® bags......................................................................................
<br />25 each
<br />Traffic cones (<_25)/barricades(singletane).....................................55
<br />day
<br />Turbiditymeter.................................................................................80
<br />day
<br />Tyvek® suit (each)..............................................................................
<br />25 each
<br />Vapor sampling box...........................................................................65
<br />day
<br />Vehicle usage (carrying equipment) .................................................
<br />20
<br />hour
<br />VelociCalc..........................................................................................40
<br />day
<br />Visqueen (20 x 100 feet)..................................................................
<br />130
<br />roll
<br />Water level indicator (electronic well sounder) <300 feet deep we11100day
<br />ZIPLEVEL®...........................................................................................
<br />40
<br />day
<br />Other specialized geotechnical and environmental testing and
<br />monitoring equipment are available, and priced per site
<br />Fee 2024 www.verdantas.com Page 3 of 4
<br />
|