Laserfiche WebLink
CITY OF SANTA ANA <br />Works Association, California Department of Transportation, Americans with Disabilities Act, <br />City of Santa Ana Municipal Code (SAMC), professional Standards established by the City, and <br />any other federal, state, or local guidelines required in the project. <br />As part of the PS&E package, the Consultant shall prepare the special provisions pertaining to <br />the items of work included in the plans that are not addressed on the latest editions of the <br />applicable standards. <br />The Consultant shall have complete responsibility for the accuracy and completeness of all <br />documents and plans prepared. The plans will be reviewed by the City of Santa Ana for <br />conformity with the requirements of the Agreement. Reviews by the City of Santa Ana DO NOT <br />include detailed review or checking of design for the accuracy with which such designs are <br />depicted in the documents and the plans. The documents and plans furnished under the <br />Agreement shall be of a quality acceptable to the City of Santa Ana. The criteria for acceptance <br />shall be a product of neat appearance, well organized, technically and grammatically correct, <br />checked and dated, and having the maker and checker identified. <br />The Consultant shall have project management control procedures in effect during the entire <br />time work is being performed under the Agreement. This task shall include the following: <br />Project Management Plan- the consultant shall provide a detail management plan <br />including information and coordination with other agencies to ensure compliance and <br />completion of the (PS&E) packages. This plan shall include all milestones and task <br />breakdown for each of the tasks and subtasks included therein. The project management <br />shall be submitted to the Project Manager for review and within 15 calendar days of the <br />issued Notice to Proceed <br />• Deliverables <br />• Quality Control/Quality Assurance (QA/QC) Plan <br />• Project Schedule/Invoicing <br />Project Correspondence <br />In case of conflict, ambiguities, discrepancies, errors, or omissions, the consultant shall submit <br />the matter to the City for clarification. <br />CITY RESPONSIBILITIES <br />The City will provide information in its possession relevant to the preparation of the required <br />information in the RFP. The City will provide only the staff assistance and the documentation <br />specifically in referred to herein. <br />• Furnish scope of work and provide general direction as needed for the assigned project <br />• All plan check coordination within the City <br />EXHIBIT I - 7 <br />