My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Agreement for Elevator Maintenance and Repair
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025
>
Item 15 - Agreement for Elevator Maintenance and Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 5:21:57 PM
Creation date
5/28/2025 4:16:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
6/3/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) CITY OF SANTA ANA <br />iii. Overspeed Governors, Governor Tension Sheave Assemblies, and Car and <br />Counterweight Safeties <br />iv. Limit, Landing and Slowing Switches <br />v. Door Protective Devices and Alarm Bells <br />i. Conduct a yearly no-load, low speed test of car and counterweight safeties and a test of <br />buffers. <br />j. Periodically equalize the tension in all hoistway ropes. Replace all wire ropes and <br />fastenings, when conditions warrant. <br />k. Examine and when conditions warrant, regroove or replace all sheaves, governor tension <br />sheaves, secondary or deflection sheaves, and compensation sheaves. <br />I. Periodically examine, lubricate, adjust and when conditions warrant through normal wear <br />and tear, repair or replace the following accessory equipment: <br />i. Car and Corridor Operating Push -buttons <br />ii. Load Weighing Equipment <br />iii. All Hail Lanterns, Car Positions, and Hall Position Indicators, Lobby Control <br />Panels, Car Operation Panels, and all other Signal and Accessory Facilities <br />furnished and installed as part of the whole equipment. <br />m. Periodically clean all elevator machine rooms, secondary areas, elevator hoistways, and <br />pit areas. Contractor will be responsible for keeping the machine rooms, the exterior of the <br />machinery, and any other parts of the equipment subject to rust, properly painted, <br />identified, and presented to all times. During the course of each examination, all <br />accumulated refuse in the pit areas will be discarded. <br />n. Annual clean the elevator hoistway and related equipment including rails, inductors, <br />hoistway door hangers and track relating devices, switches, buffers, car tops and pit areas. <br />o. Steel parts cabinets will be maintained in the machine room areas to provide for the orderly <br />storage of replacement components. <br />p. Perform the following tests on the elevator equipment. <br />i. Tests of the car and counterweight safeties, governors, buffers, and all other safety <br />devices. <br />ii. The car balance will be checked and the governor set. If required, the governor will <br />be re -calibrated and sealed for proper tripping speed. <br />5. All tests performed on the elevator equipment described herein will be in accordance with the <br />most recent ANSI/ASME A17 Code requirements. Written reports of all tests shall be submitted <br />and reviewed with the City of the property within thirty (30) day following completion of all tests. <br />6. Check the group dispatching systems and make necessary tests to insure that all circuits and <br />time settings are properly adjusted, and that the system performs as designed and installed on <br />an annual basis. <br />7. Bi-Annual testing of the Fireman's Emergency Service operation will be performed to assure <br />proper operation of the system. <br />K. EXCLUDED SERVICES <br />1. The following items of elevator equipment, hoistway, and machine room enclosures are not <br />included in this contract: <br />ELEVATORS -ALL <br />City of Santa Ana RFP No. 25-007A Page 26 of 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.