Laserfiche WebLink
PROJECT TITLE: <br />Broadway St Rehab: 17th to <br />Main place <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along Broadway Street between 17th Street and Mainplace Drive. <br />PROJECT COSTS FY 25/26 FY 26/27 <br />Engineering 307,700 <br />TOTAL 307,700 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 <br />RMRASB1 307,700 <br />TOTAL 307,700 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating due to the weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Alex Bangean, Senior Civil Engineer <br />DATE: <br />17-Apr-2025 <br />2 <br />EXHIBIT 2