Laserfiche WebLink
PROJECT TITLE: <br />MacArthur Blvd Rehab: Harbor to <br />Fairview <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP � <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within along MacArthur Boulevard between Harbor Boulevard and Fairview Street. <br />PROJECT COSTS FY 25/26 FY 26/27 <br />Construction 4,086,388 <br />Engineering 326,912 <br />TOTAL 4,413,300 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 <br />GAS TAX 3,972,000 <br />RMRA SB1 441,300 <br />TOTAL 4,413,300 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating due to the weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Gilbert Castillo, Senior Engineer <br />DATE: <br />17-Apr-2025 <br />7 <br />EXHIBIT 2