My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - for Fiscal Year 2025-26 Senate Bill 1 Local Steets and Roads Fudning Program
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025
>
Item 21 - for Fiscal Year 2025-26 Senate Bill 1 Local Steets and Roads Fudning Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:55:46 PM
Creation date
5/28/2025 4:51:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
6/3/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SB1 FY 2025-26 Projects List <br />June 3, 2025 <br />Page 3 <br />5 <br />0 <br />7 <br />9 <br />pavement and replacement of <br />curbs, gutters and sidewalks) <br />Broadway Rehabilitation <br />(Reconstruction of existing <br />pavement and replacement of <br />damaged curbs, gutters and <br />sidewalks) <br />17th Street to MainPlace Drive $307,700 <br />Broadway Rehabilitation <br />(Reconstruction of existing <br />pavement and replacement of <br />damaged curbs, gutters and <br />sidewalks) <br />Bishop Street to 1st Street $135,300 <br />Civic Center Drive Rehabilitation <br />(Replacement of existing asphalt <br />pavement with concrete <br />pavement) <br />Minter Street to Santiago Street $742,000 <br />Dyer Road Rehabilitation <br />(Reconstruction of existing <br />pavement and replacement of <br />damaged curbs, gutters and <br />sidewalks) <br />Main Street to Grand Avenue $595,100 <br />Grand Avenue Rehabilitation <br />(Reconstruction of existing <br />pavement and replacement of <br />damaged curbs, gutters and <br />sidewalks) <br />1st Street to Santa Ana Boulevard $297,300 <br />MacArthur Boulevard <br />Rehabilitation (Reconstruction of <br />existing pavement and <br />replacement of damaged curbs, <br />gutters and sidewalks) <br />Harbor Boulevard to Fairview Street $441,300 <br />Main Street Rehabilitation <br />(Reconstruction of existing <br />pavement and replacement of <br />damaged curbs, gutters and <br />sidewalks) <br />Edgewood Road to Memory Lane $274,200 <br />Raitt Street Rehabilitation <br />(Reconstruction of existing <br />pavement and replacement of <br />damaged curbs, gutters and <br />sidewalks) <br />Civic Center Drive to Washington <br />Avenue <br />$2,646,077 <br />Raitt Street Rehabilitation <br />(Reconstruction of existing <br />pavement and replacement of <br />damaged curbs, gutters and <br />sidewalks) <br />McFadden Avenue to 1st Street $1,469,000 <br />Total: $8,154,314
The URL can be used to link to this page
Your browser does not support the video tag.