Laserfiche WebLink
PROJECT TITLE: <br />17th St Rehab: Gabri/lo Park to City <br />Limit <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />,_._ " <br />,.;.. \ l <br />.: <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along 17th Street between Gabri/lo Park Drive and City Limit. <br />PROJECT COSTS <br />Engineering <br />TOTAL <br />SOURCE OF FUNDS <br />RMRASB1 <br />TOTAL <br />FY 25/26 FY 26/27 ---- <br />411,837 ---- <br />411,837 <br />FY 25/26 FY 26/27 ---- <br />411,837 ---- <br />411,837 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating due to the weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Jason Gabriel, Principal Civil Engineer <br />DATE: <br />17-Apr-2025 <br />12 <br />EXHIBIT 2