My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRIANGLE DECON SERVICES, INC. (WATER ROOM IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
TRIANGLE DECON SERVICES, INC. (WATER ROOM IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 10:30:19 AM
Creation date
6/3/2025 1:12:50 PM
Metadata
Fields
Template:
Contracts
Company Name
TRIANGLE DECON SERVICES, INC. (WATER ROOM IMPROVEMENTS)
Contract #
P25-6426
Agency
Public Works
Council Approval Date
4/15/2025
Expiration Date
1/1/1900
Insurance Exp Date
8/19/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 25-6426 Water Room Improvements Change Order Number <br /> To Triangle Decon Services Inc. Contractor <br /> You are hereby directed to rrake the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. Replacement of existing restroom fixtures. Restroom toilet, sink, and fixtures replaced with <br /> new equipment to avoid future costs and repairs <br /> AGREED PRICE=4,054.59 <br /> 2. Door frame and hardware changed due to the unavailability of the original door equipment. <br /> AGREED PRICE= 8,274.99 <br /> 3. Drywall work and patch repair due to electrical floor plan revisions from existing electrical <br /> conduits and building structure obstructions. <br /> AGREED PRICE=4,025.00 <br /> 4. Additional drywall and patch repair, due to city internet conduits blocking the layout of <br /> electrical conduits and outlets. <br /> AGREED PRICE= 1,161.50 <br /> 5. Electrical work pertaining to CO 315. Electrical work includes additional conduit, wiring, <br /> junction boxes, and labor. <br /> AGREED PRICE =4,262.46 <br /> TOTAL AGREED PRICE = $21,778.54 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.