Laserfiche WebLink
�r CITY OF SANTA ANA <br /> 16. All leaking or defective piping, valves, or other system components shall be repaired <br /> within twenty-four (24) hours of detection. <br /> 17. Contractor will keep system in operation by valve or head adjustment to keep all <br /> systems operating at manufacturer's recommended operating pressure. <br /> a. This shall be accomplished by valve throttling pressure gaging. <br /> i. The valves should be throttled to prevent sprinkler heads from fogging, <br /> allowing droplets for effective watering. <br /> b. The Projects Manager or designee may request a coverage test to evaluate proper <br /> settings, timing, usage, or maintenance of system <br /> 18. Contractor shall be responsible for periodic inspection of surface drains located within <br /> the landscaped areas. <br /> a. These drains shall be checked to assure proper functioning. <br /> b. Remove any debris or vegetation that might accumulate at the inlet and prevent <br /> proper flow of water <br /> IV. TRASH REMOVAL AND DISPOSAL: <br /> 1. The trash likely to be encountered during the course of cleaning includes but is not <br /> limited to: <br /> a. Litter, <br /> b. Trash, <br /> c. Bio-waste and hypodermic needles, <br /> d. Plastic and cardboard containers, <br /> e. Plywood, <br /> f. Wsed lumber, <br /> g. Discarded furniture, and <br /> h. Small appliances, toys and other household items <br /> 2 Remove and dispose of items listed above according to all applicable laws, codes, <br /> and requirements. <br /> a Note that trash removal is incidental to weed removal by either crew. It is included so <br /> that the areas looks clean after the weed removal work is completed. <br /> 4. Trash removal and disposal will be at the Contractors expense and must be included <br /> in the hourly price. <br /> V. OPTIONAL AS-NEEDED: WEED ABATEMENT , DEBRIS REMOVAL , WEED SPRAYING <br /> SERVICES <br /> 1. Crew Size: varies depending on need; City estimates, but does not guarantee or imply <br /> guarenteed hours per year for City-requested optional as-needed services. <br /> 2 All property (lots, channels, easements, alleys) designated by the City Projects <br /> Manager or Inspector and assigned to the contractor for weed abatement and cleaning <br /> 28 <br /> MEDIAN AND RIGHT OF WAY LANDSCAPING MAINTENANCE-RFP#25-058 <br />