Laserfiche WebLink
_U;0 <br />ly m <br />m o <br />E <br />rn a' <br />o :3 <br />_ Z <br />M IV <br />O <br />M <br />U-i <br />W.} <br />PUBLIC WORKS AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION XII <br />ADOPTED PROPOSED FDEPARTMENT <br />ACCOUNT MISCELLANEOUS FEE UNIT FY 24-25 FEES FY 25-26 FEES CHANGES <br />01117002-53741 <br />06017002-53709 <br />-4002-51708 <br />01117002 <br />10117002-51708 <br />t3861700�51708 <br />01117002 <br />04917102-50300 <br />01117002-53746 <br />Small Cell Initial License Fee <br />Water Capacity Fee <br />518" Meter <br />3/4" Meter <br />1" Meter <br />i.S" Meter <br />2" Meter <br />3" Meter <br />4" Meter <br />6" Meter <br />CIP Construction Permit Fee <br />CIP Construction Permit Consultant Fee <br />Per CIP CWA Oversight Consultant Proposal Per Project Scope of Work <br />CIP Construction Permit Oversight Fee <br />Harbor Specific Plan <br />Non -Residential - Other Use <br />Non -Residential - Retail/Restaurant <br />Residential - Single Family/Multi-Family <br />Honorary Street Naming Application - Processing Fee <br />Each <br />Per Permit <br />Each <br />Each <br />Per 1,OOD 5% Ft <br />Per 1,000 Sq. Ft <br />Per Unit <br />Each <br />Actual Cost <br />930-00 <br />1,395.00 <br />2,325.00 <br />4,65D.00 <br />7,440.00 <br />16,275.OD <br />30,496.00 <br />62,928.00 <br />394.00 <br />Actual Cost <br />$2,000 or 10% of CIP <br />Construction Permit <br />Consultant Fee, <br />whichever is greater <br />1,098,14 <br />5,279.40 <br />950.00 <br />678.00 <br />Actuai Cost <br />930.00 <br />1,395.00 <br />2,325.00 <br />4,650.00 <br />7,440. W <br />16,275.00 <br />30,496.00 <br />62,928.00 <br />413.00 <br />Actual Cost <br />$2,000 or 1D%of CIP <br />Construction Permit <br />Consultant Fee, <br />whichever is greater <br />1,093.14 <br />5,279,40 <br />85D.00 <br />710.00 <br />Modified Account <br />Modified Account <br />128 <br />