Laserfiche WebLink
CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along <br />Bristol Street between Santa Clara Avenue and Memory Lane. <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating <br />due to weather, age, and heavy usage. Some of the adjacent curbs, <br />gutters, driveway approaches, curb ramps, and sidewalks are also in <br />various states of disrepair and require replacement. <br />PROJECT TITLE: <br />Bristol St Rehab: Santa Clara to <br />Memory Ln <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Gilbert Castillo, Senior Engineer 13-Jun-2025 <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction 1,153,688 ------ <br />Engineering ------- <br />TOTAL 1,153,688 ------ <br />SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />RMRA SB1 640,461 ------ <br />WATER CAPITAL 513,227 ------ <br />TOTAL 1,153,688 ------ <br />EXHIBIT 5 <br />  <br />  <br />City Council 21 – 21 7/1/2025