CITY OF SANTA ANA
<br /> EXHIBIT I
<br /> SCOPE OF SERVICES
<br /> Contractorshall perform services as set forth below and furnish all labor, equipment, materials, and
<br /> supervision to perform Custodial Services at Park Restrooms as described herein including, but not
<br /> limited to, the following:
<br /> DESCRIPTION OF WORK
<br /> It is the intent of this agreement to continually improve the quality of the facilities. The
<br /> Contractor shall provide all labor, training, materials, tools, equipment, transportation, hauling, dumping,
<br /> chemicals and other items needed to perform high quality park janitorial maintenance pursuant to the
<br /> terms defined herein. This RFP identifies facilities in park restrooms and park buildings. Park buildings
<br /> include restroom-only structures, which are considered park restrooms and single stall restrooms.
<br /> The Contractor shall provide all park restroom janitorial maintenance at work sites listed herein, including,
<br /> but not limited to cleaning, scrubbing, polishing, toilets, urinals, doors, walls, floors,ceilings, windows,
<br /> partitions, dispensers, hand rails plumbing fixtures, and replacing burned out lights, lens covers, removing
<br /> foreign materials i.e. paper wads stuck to ceilings, walls, etc. In addition, the Contractor shall clean the
<br /> exterior of the building surfaces including the walls, roof, windows, etc. and, other services required to
<br /> maintain the work sites in a safe, attractive and useable condition.
<br /> The Contractor shall provide all park building janitorial maintenance at work sites listed herein, including,
<br /> but not limited to cleaning, scrubbing, polishing of windows, desks, cabinets, computers, phones, kitchen
<br /> appliances, hanging amenities (clocks, pictures, Knox boxes, etc.), toilets, urinals, doors, walls, floors,
<br /> ceilings, windows, partitions, dispensers, hand rails, plumbing fixtures, and replacing burned out lights at
<br /> the contractors expense, lens covers, removing foreign materials Le, paper wads stuck to ceilings, walls,
<br /> etc. In addition, the
<br /> Contractor shall clean the exterior of the building surfaces required to maintain the work sites in a safe,
<br /> attractive and useable condition. Staff should be trained in handling hazardous waste, human waste and
<br /> needles.
<br /> Contractor understands that it is assuming maintenance responsibility of the parks/locations " as is" and
<br /> is responsible for improving all aspects of the parks facilities to the quality described in these
<br /> specifications and interpreted by the City' s Representative.
<br /> Proposers shall be responsible for monitoring the site to obtain information regarding this solicitation.
<br /> 1.0 DEFINITIONS
<br /> 1.1 "City's Representative" shall mean the Executive Director of Public Works Agency designated
<br /> representative.
<br /> 1.2 "Cleaning"shall mean the practice of thoroughly removing all stains,foreign materials, mineral
<br /> deposits, etc. to achieve a high quality "like new" appearance.
<br /> 1.3 "Sanitizing" shall mean to disinfect (eradicate disease causing agents) by use of germicidal or
<br /> other approved disinfecting products.
<br /> City of Santa Ana RFP 25-043 Page 19 of 44
<br />
|