Laserfiche WebLink
(9) <br /> CITY OF SANTA ANA <br /> 3.0 PARK RESTROOM MAINTENANCE <br /> Routine maintenance shall include but not be limited to the following services performed at the <br /> Work Sites listed in Exhibit III. <br /> 3.1 Daily Cleaning Schedule (Daily cleaning is to be performed three times per day) <br /> 3.1.1 Restock all supplies daily so dispensers are completely full. Replace vandalized <br /> dispensers with approved manufacturer and model dispensers to Park Maintenance <br /> specifications upon discovery. Dispensers will be provided by the City. <br /> 3.1 .2 Flush toilets and urinals prior to finishing and add approved products. <br /> 3.1 .3 Check toilets and urinals for stoppages and use plunger and/or hand auger to unplug. <br /> Note that the Contractor be unsuccessful in unplugging the toilet or urinal causing the City <br /> to unclog the unit, and the clog is unplugged by plunger and/or hand auger, the cost for <br /> this service will be deducted from the Contractor's next monthly invoice. <br /> 3.1.4 If stoppages cannot be unplugged or if other plumbing problems are noticeable, notify the <br /> City's Representative immediately via phone and/or email. Contractor shall remove all <br /> waste from the clogged urinal/commode, clean the urinal/commode and place a plastic <br /> waste receptacle liner over the unit to protect it from use until a Plumber can clear the <br /> clog. <br /> 3.1.5 The contractor will be called to clean up and disinfect the restroom after the mainline or <br /> clog has been cleared. <br /> 3.1.6 Remove all stains, dust, litter, debris and otherwise foreign matter on all interior surfaces <br /> including doors, sills, partitions, floors, walls, ceilings, etc. This includes, but not limited <br /> to, wads of paper stuck on ceilings, tape, etc. <br /> 3.1 .7 Empty, clean, and sanitize receptacles inside and out. <br /> 3.1.8 During the 1 st cleaning, the contractor shall pressure wash the interior and 25' around the <br /> exterior of the restroom with bio-based scented disinfecting. <br /> 3.1.9 Clean and sanitize all surfaces, including walls, doors, partitions, door/window jambs, <br /> vents, light fixtures, ceilings, etc. Tile floors and walls shall be cleaned and polished. <br /> 3.1.10 Clean, sanitize interior and exterior of washbasins and around all fixtures to remove <br /> mineral deposits, water spots, dirt, grim, and any other unclean condition. Polish all metal <br /> fixtures surfaces, inside and out, including but not limited to toilets, urinals, plumbing, <br /> sinks, flush valves, mounting plates, dispensers, nuts, screws, traps, hose bibs, water <br /> connections, handrails, mirrors, etc. using approved products. <br /> 3.1.11 Clean and disinfect benches using approved germicidal cleanser. <br /> 3.1.12 Clean and disinfect lockers (inside, outside and tops) using approved germicidal cleanser. <br /> Throw away any trash found in unlocked lockers or on top of lockers. <br /> 3.1.13 Clean and sanitize shower walls,fixtures and curtains using approved germicidal cleanser. <br /> 3.1.14 Pick-up, clean, sanitizes and removes trash and debris, including but not limited to feces, <br /> urine, paper, within 25' feet of the building in each direction. <br /> 3.1.15 Clean exterior of the building/roof free of all stains, dirt, grime, sand, or other foreign <br /> materials including paper wads, confetti, tape, slap tags, cob webs, dust, etc. within 25' of <br /> the building. <br /> 3.1.16 Turn off lights once work is completed. And/or close or open restrooms per city staff <br /> direction. <br /> 3.1.17 Clean and polish exterior of the building amenities (attached) including but not limited to <br /> drinking fountains, lights, Knox boxes, plaques, windows, etc. of dirt, grime, all foreign <br /> materials including paper wads, confetti, tape, slap tags, cob webs, dust, etc. <br /> 3.1.18 1st Cleaning, Pressure wash all exterior wall and pavement surfaces to remove dirt, dust, <br /> debris, stains, etc. to within 25' of the building. <br /> 3.1.19 Pressure equipment will be gas operated <br /> City of Santa Ana RFP 25-043 Page 22 of 44 <br />