Laserfiche WebLink
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 25-6907 <br />LOCAL STREET PREVENTATIVE MAINTENANCE FY 24-25 <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: ONYX PAVING COMPANY INC. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />1,050 <br />CY <br />$ 1 U6 <br />$ 1 SSl Lk Op <br />2 <br />Asphalt Concrete (AC)* <br />1,940 <br />j TN <br />$ i,% 1 <br />$ 35 t i-1 qD <br />3 <br />Asphalt Rubber Hot Mix (ARHM)* <br />4,060 <br />TN <br />$ (S61 <br />$ &qSI ND <br />4 <br />Cold Mill (2")* <br />370,000 <br />SF <br />$ p A 71 <br />$ IS y�LOO <br />5 <br />Rubberized Emulsion Aggregate Slurry <br />(REAS) Type II <br />900 <br />ELT <br />$ Col-4Jp <br />$ Z q1 t W0 <br />6 <br />Crack Seal <br />1 <br />LS <br />$ '7*Zt �p(+� <br />$-11 t COD <br />7 <br />PCC Sidewalk (T=4")* <br />15,700 <br />SF <br />$ l t <br />$ <br />Ll 10 ©O <br />8 <br />PCC Driveway Approach (T=6")* <br />1,000 <br />SF <br />$ eto <br />$ 1b,000 <br />—KC—Ala Apron* <br />200 <br />SF <br />$ ,3 3 <br />10 <br />PCC Curb Ramp* <br />300 <br />SF <br />$ <br />$ qO® <br />t <br />11 <br />PCC Curb and Gutter (Type A-2-6 <br />and/or Match Existing) <br />1,300 <br />LF <br />$ 661 <br />l <br />12 <br />PCC Curb (SPPWC Type AI-6 and/or <br />Match Existing)* <br />120 <br />LF <br />$ �6 <br />$ q ,� <br />, <br />13 <br />PCC Cross -Gutter (Local Street)* <br />600 <br />SF <br />$ 3 5 <br />$ (a t $uo <br />14 <br />Root Shave <br />75 <br />EA <br />1 3-7 C) <br />27, `7,5D <br />P-1 of P-19 <br />