Laserfiche WebLink
(9) CITY OF SANTA ANA <br /> and could include scaled black and with and/or color roll plots, 11" x 17" and/or 8.5" x 11" handouts and/or <br /> presentation boards. <br /> Subtask 1.4: Grant Plans and Outcomes <br /> This sub-task includes the development of plan and reporting documents required to adhere to the grant <br /> funding guidelines (REAP 2.0) for the project. <br /> REAP Goals and Outcomes: The consultant shall work with City of Santa Ana staff to develop a <br /> methodology to report on how the project works towards REAP 2.0 goals. This methodology shall be <br /> presented to OCTA for approval. Once approved, the consultant shall assist City of Santa Ana in <br /> monitoring the project through each Task to ensure it continues to meet the goals and assist City of Santa <br /> Ana staff in addressing any reporting questions and concerns. <br /> Task 1— Deliverables (One hard copy and an electronic version of each): <br /> Resource Loaded Project Master Schedule <br /> Monthly Progress Reports with Project Earned Value vs. Baseline Schedule updates <br /> Project Management Plan <br /> Monthly Progress Reports <br /> Kick-Off Meeting agenda and notes <br /> PDT meeting materials, agendas, and notes <br /> Coordination meeting/technical workshop materials, agendas, and notes <br /> REAP Grant reports and plans <br /> Il. Task 2: Existing Analysis and Assessment <br /> This task includes the data collection effort necessary to develop a thorough understanding of all the <br /> Project corridor needs and challenges. <br /> Subtask 2.1: Existing Conditions Survey <br /> This sub-task includes the data collection and field survey for the Project corridor to capture existing <br /> signal and transit operations. <br /> The consultant shall coordinate with City to collect the following data necessary to thoroughly understand <br /> existing traffic conditions for the Project corridor and be able to develop transit supportive timing, as <br /> applicable. <br /> 1. Existing timing charts/sheets that include current coordination plans, traffic as-built drawings, <br /> aerial photos, maps, traffic collision data as available, and special intersection signal operations. <br /> Consultant shall also collect any as-built or related construction plans impacting signal operations <br /> relevant to this Project. <br /> 2. Signal timing and signal priority preferences, including, but not limited to, those related to <br /> pedestrian and bicycle timing, phase sequence modifications and preferences, and special <br /> operations such as conditional service, coordination preferred phase re- service, and ring-barrier <br /> logic, as well as the timing optimization software preference. <br /> 3. Historically counts, including average daily traffic (ADT) and turning movement counts (vehicle, <br /> bicycle, and/or pedestrian), along the project corridor for weekday and weekend periods <br /> 6 <br />