My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCADIS U.S., INC.
Clerk
>
Contracts / Agreements
>
A
>
ARCADIS U.S., INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 12:19:15 PM
Creation date
7/1/2025 12:18:13 PM
Metadata
Fields
Template:
Contracts
Company Name
ARCADIS U.S., INC.
Contract #
A-2025-084
Agency
Public Works
Council Approval Date
6/3/2025
Expiration Date
6/30/2030
Insurance Exp Date
6/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) CITY OF SANTA ANA <br /> The System Vendor shall clearly state and detail out the proposed method in which the proposed TSP <br /> system will send priority request messages to and obtain priority request status messages from the traffic <br /> signal controller. The consultant shall be responsible for coordination and all integration <br /> work with signal system manufacturer(Econolite), to achieve end-to-end functionality of the TSP system. <br /> Subtask 4.4: Detailed Design Documentation <br /> The consultant shall submit detailed design documentation for approval by City. The detailed design <br /> documents will identify all system components, including any equipment, and provide a narrative <br /> description of the function and architecture of the major systems and subsystems proposed by the <br /> vendor. The documentation should provide system block diagrams identifying all interfaces between <br /> system components, including external systems, that would need to interface with the TSP system. The <br /> detailed design documents must include design plans for all hardware installations. The detailed design <br /> documents should also include interface control documents and communication specifications, for all <br /> internal and external system interfaces, including those between different software and hardware <br /> systems within the transit on-board or central CADIAVL, city communication systems, and traffic signal <br /> controllers. <br /> As part of the detail design documentation, the consultant shall provide criteria for Factory Acceptance <br /> Testing (FAT) for any hardware needed to be procured for the project. <br /> Hardware and software purchases shall not be conducted prior to the approval of the detailed design <br /> documentation. For any and all hardware supplied by the consultant, the consultant shall provide City of <br /> Santa Ana with hardware submittals for review and approval, The consultant shall provide copy of the <br /> FAT results for approval prior to delivery of the hardware. It shall be the consultant responsibility to <br /> provide any ancillary equipment such as cables, mounting rails, etc. with the provided hardware. <br /> Task 4— Deliverables (One hard copy and an electronic version of each): <br /> Procure Transit Signal Priority System and Hardware <br /> Detailed Design Documentation <br /> V. Task 5: Installation, Integration and Deployment <br /> This task will focus on implementation and configuration and will leverage the Task 2 detailed surveys to <br /> implement TSP solutions. The consultant shall provide all labor, equipment, and ancillary items <br /> necessary to install, integrate, and deploy a fully operational TSP system. <br /> Subtask 5.1: Implementation Plan <br /> An Implementation Plan shall be prepared for review and approval by City of Santa Ana Project <br /> Manager prior to the start of any installation work. The plan shall describe all aspects of hardware and <br /> software installation. This includes facility and vehicle surveys, communications testing, site <br /> preparation, pre-wiring requirements, equipment and vehicle staging, production installation and <br /> sequencing, quality assurance and control, and scheduling. The Plan will also describe installation and <br /> configuration of all software systems, including the back-office applications, interfaces and web <br /> applications, and their respective schedules. <br /> The Plan will describe the power and communication requirements for each piece of equipment and at <br /> each installation location. The communication requirements will include a description of any networking <br /> equipment necessary to connect the system devices to agency network. <br /> The implementation Plan shall also include criteria for pilot test acceptance which will test various <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.