Laserfiche WebLink
(9) CITY OF SANTA ANA <br /> The System Vendor shall clearly state and detail out the proposed method in which the proposed TSP <br /> system will send priority request messages to and obtain priority request status messages from the traffic <br /> signal controller. The consultant shall be responsible for coordination and all integration <br /> work with signal system manufacturer(Econolite), to achieve end-to-end functionality of the TSP system. <br /> Subtask 4.4: Detailed Design Documentation <br /> The consultant shall submit detailed design documentation for approval by City. The detailed design <br /> documents will identify all system components, including any equipment, and provide a narrative <br /> description of the function and architecture of the major systems and subsystems proposed by the <br /> vendor. The documentation should provide system block diagrams identifying all interfaces between <br /> system components, including external systems, that would need to interface with the TSP system. The <br /> detailed design documents must include design plans for all hardware installations. The detailed design <br /> documents should also include interface control documents and communication specifications, for all <br /> internal and external system interfaces, including those between different software and hardware <br /> systems within the transit on-board or central CADIAVL, city communication systems, and traffic signal <br /> controllers. <br /> As part of the detail design documentation, the consultant shall provide criteria for Factory Acceptance <br /> Testing (FAT) for any hardware needed to be procured for the project. <br /> Hardware and software purchases shall not be conducted prior to the approval of the detailed design <br /> documentation. For any and all hardware supplied by the consultant, the consultant shall provide City of <br /> Santa Ana with hardware submittals for review and approval, The consultant shall provide copy of the <br /> FAT results for approval prior to delivery of the hardware. It shall be the consultant responsibility to <br /> provide any ancillary equipment such as cables, mounting rails, etc. with the provided hardware. <br /> Task 4— Deliverables (One hard copy and an electronic version of each): <br /> Procure Transit Signal Priority System and Hardware <br /> Detailed Design Documentation <br /> V. Task 5: Installation, Integration and Deployment <br /> This task will focus on implementation and configuration and will leverage the Task 2 detailed surveys to <br /> implement TSP solutions. The consultant shall provide all labor, equipment, and ancillary items <br /> necessary to install, integrate, and deploy a fully operational TSP system. <br /> Subtask 5.1: Implementation Plan <br /> An Implementation Plan shall be prepared for review and approval by City of Santa Ana Project <br /> Manager prior to the start of any installation work. The plan shall describe all aspects of hardware and <br /> software installation. This includes facility and vehicle surveys, communications testing, site <br /> preparation, pre-wiring requirements, equipment and vehicle staging, production installation and <br /> sequencing, quality assurance and control, and scheduling. The Plan will also describe installation and <br /> configuration of all software systems, including the back-office applications, interfaces and web <br /> applications, and their respective schedules. <br /> The Plan will describe the power and communication requirements for each piece of equipment and at <br /> each installation location. The communication requirements will include a description of any networking <br /> equipment necessary to connect the system devices to agency network. <br /> The implementation Plan shall also include criteria for pilot test acceptance which will test various <br /> 11 <br />