(9) CITY OF SANTA ANA <br /> each city's IT staff to establish such connection in conformance to each agency's IT policies. If needed, <br /> the consultant may elect to furnish and install a communications server at TMClcentral office to <br /> facilitate communications between its TSP cloud application platform and the traffic signal controllers. <br /> Subtask 5.5: System Configuration and Deployment <br /> The consultant shall set up and configure the TSP system including entering all system and configuration <br /> parameters. This includes integrating the 19 signalized intersections and one bus route under this project <br /> into the TSP cloud application platform. <br /> The consultant shall configure initial settings such as conditional parameter and other operating <br /> parameters. Values for conditional parameters shall be approved by City of Santa Ana. The consultant <br /> shall develop TSP signal timing parameters for each intersection traffic signal controller. These include <br /> controller parameters for defining the transit phase, values for early green and green extension, <br /> maximum priority call time, minimum time between consecutive priority requests, etc. The TSP signal <br /> timing parameters will be submitted to City for their review and approval. Upon approval, the consultant <br /> shall coordinate with City to implement the approved timing parameters into each controller. <br /> The consultant will also be responsible for any timing modifications necessary for the operation of the <br /> TSP. Timing modifications shall include, but is not limited to basic timing, coordination timing, and transit <br /> parameters available in the City's system. Close coordination with City staff will be necessary to ensure <br /> modifications are made per City standards and preference. <br /> Subtask 5.6: Pilot Deployment Testing <br /> The consultat shall activate and deploy the TSP system at two intersections initially to assess issues <br /> related to latency, communications with buses or CADIAVL, etc. Consultant shall submit test results for <br /> every test completed as included in the approved pilot test plan. The consultant shall note any exceptions <br /> to a test such as test conditions, corrective actions, or re-testing. The pilot deployment testing phase is <br /> not complete until the test report is approved by City of Santa Ana. <br /> Subtask 5.7. Full System Configuration and Deployment <br /> Following acceptance of Pilot Deployment Testing, the consultant shall then activate and deploy the TSP <br /> system at all intersections for field operation and fine-tune all system settings, configuration parameters, <br /> and controller timing parameters to satisfy the system requirements. <br /> Transit Signal Priority Implementation Technical Memorandum: The consultant shall prepare a <br /> memorandum detailing the TSP solution, including the logic for implementing the recommended solution <br /> and timing and how it can be scaled to other corridors and citywide. The memorandum shall also include <br /> any challenges regarding the procurement, configuration, and implementation that can be addressed for <br /> future implementations. The consultant shall share the draft of this memorandum with all stakeholders to <br /> provide their input for additional consideration outside of the prototype area. <br /> Task 5— Deliverables (One hard copy and an electronic version of each): <br /> Implementation Plan Memorandum <br /> Pilot TSP Deployment <br /> Full System Deployment <br /> Summary of System Configurations <br /> 13 <br />