My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ocean Blue Environmental Services, Inc. (7)
Clerk
>
Contracts / Agreements
>
O
>
Ocean Blue Environmental Services, Inc. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 3:50:55 PM
Creation date
7/8/2025 3:50:23 PM
Metadata
Fields
Template:
Contracts
Company Name
Ocean Blue Environmental Services, Inc.
Contract #
N-2025-176
Agency
Parks, Recreation, & Community Services
Expiration Date
5/28/2026
Insurance Exp Date
7/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAYMENT TERMS <br /> All terms are net-thirty (30) days upon receipt of invoice, unless previous arrangements have been made. All <br /> emergency response work for non-established customers is C.O.D.. <br /> DISPOSAL AND OUTSIDE COSTS <br /> All disposal, services, non-heavy equipmentrenCals, and mate' rials-not on the rate sheet will be billed at cost plus a <br /> ten percent(10%) handling charge. Heavy equipment rental will-be billed at cost plus ten percent•(101/6) handling <br /> charge due to high liability cost. <br /> Item or Service Each. Hourly- Hourly- Hourly- <br /> Straight Time Overtime Premium <br /> :. Time <br /> All call outs. Portal to Portal rates apply:Time Four(4),hour <br /> charges include personnel, equipment and minimum charges <br /> materials for preparation, mobilization, travel to and will apply <br /> from site, demobilization,decontamination, <br /> transportation and unloading. <br /> DISPOSAL AND OUTSIDE COSTS <br /> All disposal, services, non-heavy equipment cost plus a ten <br /> rentals, and materials not on the rate sheet percent(10%) <br /> handling charge <br /> Heavy equipment rental cost plus ten <br /> percent(10%) <br /> handling charge <br /> Personnel and equipment with operator rate An additional <br /> $40 per hour <br /> will be added <br /> HAZARDOUS WASTE-TRAINED PERSONNEL <br /> PROJECT MANAGER $99.27 $118.44 $169.02 <br /> SUPERVISOR $99.27 $118.44 $169.02 <br /> CHEMIST/ INDUSTRIAL HYGIENIST $99.27 $118.44 $169.02 <br /> LEAD TECHNICIAN $62,10 $87.84 $114,57 <br /> EQUIPMENT OPERATOR $62.10 $87.84 $114.57 <br /> TECHNICIAN $62.10 $87.84 $114.57 <br /> CERTIFIED HAZARDOUS WASTE <br /> TRANSPORTATION VEHICLES <br /> 25'EQUIPMENT TRAILER $38.16 <br /> BOB CAT WISOLID TIRES $69.22 <br /> CREW VAN $47.70 <br /> EMERGENCY RESPONSE UNIT-LARGE $252.99 <br /> EMERGENCY RESPONSE UNIT-SMALL $176.68 <br /> GEAR TRUCK Wl LIFTGATE $54.45 <br /> STREET SWEEPER $95.49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.