My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PYRAMID GROUP INTERNATIONAL (3)
Clerk
>
Contracts / Agreements
>
P
>
PYRAMID GROUP INTERNATIONAL (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:25:47 PM
Creation date
7/22/2025 2:18:44 PM
Metadata
Fields
Template:
Contracts
Company Name
PYRAMID GROUP INTERNATIONAL
Contract #
N-2025-199
Agency
Public Works
Expiration Date
6/30/2026
Insurance Exp Date
3/22/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! Pyramid Group International, Inc. <br /> Y p <br /> PYRAMID GROUP <br /> 2025 FEE SCHEDULE <br /> PERSONNEL CHARGES TRAVEL <br /> The charge for all time required for the Vehicles used on project assignments will be <br /> performance of the Scope of Work by Pyramid charged at$75 per day.Mileage is billed at the <br /> Group International (PGI) staff, including office, current rate established by the Internal <br /> field and travel time, will be billed at the hourly Revenue Service plus 15%.Per Diem is billed at <br /> rate according to the labor classifications: a unit cost of $60 per day. Airfare, lodging, <br /> rental cars and associated expenses are billed <br /> at cost plus 15%. <br /> Labor Classification Hourly Rate FIELD EQUIPMENT <br /> Jr.Staff Engineer/Scientist $130 Field Equipment is billed at standard unit costs. <br /> Staff Engineer/Scientist $145 Rate schedules are available upon request. <br /> Sr Staff Engineer/Scientist $165 <br /> Project Engineer/Scientist-1 $185 <br /> Project Engineer/Scientist-11 $195 SUBCONTRACTORS AND REIMBURSABLES <br /> Sr Project Engineer/Scientist-I $205 <br /> Sr Project Engineer/Scientist-11 $250 The costs of subcontractors, materials, <br /> Principal $290 equipment rental and costs incurred will be <br /> Project Assistant $120 charged at cost plus 15%. <br /> Technician $120 <br /> Drafter $145 <br /> Sr Technician $145 <br /> Compliance Inspector $140 OTHER PROJECT CHARGES <br /> Technical Editor $130 The cost of additional report reproduction and <br /> special project accounting will be billed as <br /> appropriate. Plotting plans are charged by size, <br /> Emergency response will be charged at a rate of 1.5 black and white or color, and by the number of <br /> times the standard hourly rate. copies supplied. <br /> When PGI Staff appear as expert witnesses at court <br /> trials, mediation, arbitration hearings or SHIPPING CHARGES AND POSTAGE <br /> depositions, their time will be charged at 2.0 times <br /> the standard rate. Shipping charges include couriers and postage. <br /> All time spent preparing for such trials,hearings,and They are charged at cost plus 15%. <br /> depositions,will be charged at the standard hourly <br /> rate. <br /> The Fee Schedule is adjusted eachyear to reflectthe economic changes for the newyear. <br /> The new schedule will apply to existing and new assignments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.