My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIKE BUBALO CONSTRUCTION, CO., INC. (ROUSSELLE STREET FLOOD PROTECTION PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MIKE BUBALO CONSTRUCTION, CO., INC. (ROUSSELLE STREET FLOOD PROTECTION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 11:10:59 AM
Creation date
7/24/2025 11:10:40 AM
Metadata
Fields
Template:
Contracts
Company Name
MIKE BUBALO CONSTRUCTION, CO., INC.
Contract #
P23-6627
Agency
Public Works
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 23-6617 <br /> ROUSSI 1.1.F. S-IRI".1"T FL.001) PROTEC 1 ION PROJECT <br /> Item Description Q1}• Unit Unit Price Amount <br /> S"Clan 150 Ductile Iron Il nier Main <br /> -tt) 1-ertic,11 Offwl Per C.S.:1.Sid, [41 3A 80 L.!' S S <br /> �ti ith Ada aicrs per C.S,A.Sid. 1443, 600.00 48,000.00 <br /> Sic-nin and SIripino"l[nrfudes Renumal <br /> al DC'F.ximinf"Stripinu;Tenement f LS S 5 <br /> '+lut9:in�s) 20,000.00 20.000.00 <br /> 42 vidilional PoIlloling(:15-Nte,.fed)* 5 EA 55,000,00 S25,000.00 <br /> Tree Removal and Repiacemeni{:1y <br /> 1 'Needed) 7 F.a 55,000.00 '35,000.00 <br /> -W Ruur Sha%fiwo(As-\ceded) 15 LA '700.00 "' 10,500.00 <br /> 1.€utdsca1e1estahlishttir€tit f LS 58,000,00 S8,000.00 - <br /> 46 (_0T15t1'ntri0 l I'errliit I [.5 S17.609 S 17.669 <br /> Bid Alternates <br /> -7 f 1 <br /> 47 .add-Alt I.lnitseapintI I t.S 5 $ I <br /> 55,000.00 55,000.00 <br /> 1 <br /> TOTAL BASE BID 54,058,259.00 <br /> i <br /> TOTAL ADD ALTERNATE B10 I '4,113,259.00 <br /> The kmest responsible hidder shall be selected based on the total Ease hid. The Cite reserves the <br /> right to a%Nard the Base Biel. and aril, all. or none of the add-alternate hid items 6fall ). <br /> ` `file Liva11161N' fix• this hid item is shomi Im bid comparison onl\. This hid item Shall not he <br /> SUbleci to the "25%" limit as stated ill Section 7-1.5 ofthe Standard Specifications. Tile actual <br /> hill€)Cult I€1r this item t1 ill be dictated by the U01-r-cli LIL11111trt1' LISed, 111d the Auyencl reserves the <br /> right to increase or decrease the gitanti1\ of this item accordilluk. <br /> This bid item is considered a Specialty Item per Section 3-2 Of the Stirndart:[ Specificatic111S. <br /> TINJL MR CONIPLETION OF IMPROVFNIENTS AND LI UIDATL:D DM IACI".S <br /> The Undersigmed budder Ilerehs proposes to complete the k-Vork Im the total Base bid anioLlnt <br /> sho«n above.Ncithin 200 'i orkitlgdays alter till commencement date stated in the Notice to <br /> Proceed. Upon issLJaIlcc of the Notice to Procced. Contractor shall inimedialely plLiee order Ibr <br /> loll,-lead Lillie items (i.e. Reinforced Concrcie l3o.\ storm drain. Filterra t'nits. etc.) in <br /> accUrdance with 'grant flrlldirlg NgUlr'Cmt IUS. Work shall bu completed b\ December 31. 1-025. <br /> ReFer to the Grant Agreement included In Appcticlix K. <br /> I'hc ligUidaled damages 3111L)11111. Ir-1 Iit-ti ol'the amount specified I11 SUI)SCClion 6-9 of the <br /> Standard S,p"ilications,shall he S,3.750 per calendar day. <br /> P-3 oI*f-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.