My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY AND THE CITY OF IRVINE
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY AND THE CITY OF IRVINE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 4:41:32 PM
Creation date
7/31/2025 4:41:08 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY AND THE CITY OF IRVINE
Contract #
A-2025-110
Agency
Public Works
Council Approval Date
7/1/2025
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the Roadway Improvement, to the extent such Total Costs remain <br /> outstanding, in an interest bearing account In a financial institution <br /> acceptable to both Irvine and Santa Ana. Irvine shall not withdraw any of <br /> the principal of such amount except in connection with the design and <br /> construction of the Roadway Improvement, Including but not limited to <br /> alignment.studies, necessary environmental documentation, land <br /> acquisition costs, costs of design and construction, and administrative <br /> staff costs related to the Roadway Improvements. <br /> 2. Responsibilities of the Parties <br /> A. "Total Costs" defined. The term "Total Costs" means all costs incurred in the design and construction of an improvement (i.e., the Roadway <br /> Improvement or the Overcrossing Improvement), including, but not limited <br /> - - - - -— o;- costs of'prepaPation of envi�omm �tal documentation, costs of land <br /> acquisition (including any costs incurred in any eminent domain action), <br /> costs of desigrtand construction, and Santa Ana's administrative staff <br /> costs, so long as such administrative staff costs related to Roadway <br /> Improvement do not exceed 5% of the Total Costs (excluding <br /> administrative staff costs) of the improvement ("Improvement Work"), <br /> i <br /> B, To assist in minimizing Total.Costs of Roadway Improvement, Santa Ana <br /> shall consider and process for approval a reduction of otherwise required <br /> landscape setbacks during the right of way acquisition phase of the project <br /> if, absent such reduction, the taking of buildings would be necessary to. <br /> construct the Roadway Improvement. Irvine will mitigate parking losses <br /> incurred by any parcels affected by partial acquisitions by the addition of <br /> onsite parking spaces through reconfiguration of the site., or by.acquisition <br /> and development of adjacent real estate for parking. All parking mitigation <br /> plans will be subject to the approval of Santa Ana. <br /> C, "Lead Agency" defined, As used herein, the torm "Lead Agency" means <br /> the city (Irvine or Santa Ana)which is responsible for undertaking the <br />
The URL can be used to link to this page
Your browser does not support the video tag.