Laserfiche WebLink
'-1' CITY OF SANTA ANA <br /> D. Window Boarding Specification <br /> - - ii2'CDXPLYWOOD _ - <br /> �_ -- - --� CUT TO TO COVER <br /> WINDOW OPENING <br /> 1 I SECURE TO STRUCTURE <br /> p 1 I <br /> WITH 1.5A'(GD} <br /> I �� I GALVANIZED NAILS <br /> ! t 2 X 4 BRACE <br /> I ! <br /> ! CUT TO OUTSIDE <br /> I I DIMENSION OF <br /> t I <br /> I ! WINDOW TRIM <br /> I t ' <br /> t I ' <br /> ! I <br /> 1 ! 2 X 4 BRACE <br /> 1 ! CUT TO SIZE OF <br /> I ! PLYWOOD <br /> I ! <br /> 1 I <br /> I 1 � <br /> I t y <br /> ! 1 1 <br /> 1 t 1\ <br /> ! I <br /> I a <br /> I I fs <br /> I 1 18"CARRIAGE BOLT - <br /> 1 t 12"LONG,COURSE THREAD <br /> NUT TO MATCH, WASHERS INSTALLED <br /> ON BOTH SIDES <br /> WINDOW- OUTSIDE VIEW ROUNDED HEAD OF BOLT ON OUTSIDE <br /> NOTES: <br /> 1) FOR DOUBLE HUNG WINDOWS, SLIDE SASH TO CENTER OF UNIT AND PASS <br /> BOLTS THROUGH OPENINGS AT TOP AND BOTTOM. <br /> 2) STORM WINDOWS SHOULD BE REMOVED AND STORED INSIDE STRUCTURE. <br /> 3) OUTSIDE TRIM MAY HAVE TO BE REMOVED TO ACCOMMODATE A FLUSH AND <br /> TIGHT FIT. <br /> 4) TIGHTEN NUTS FROM INSIDE ENOUGH TO SLIGHTLY COMPRESS 2X4 BRACE. <br /> 5) BRACE LOCATIONS: A= 113 B (SEE DIMENSION LOCATIONS ON DRAWING) NOTE: <br /> WINDOWS 3 FEET IN HEIGHT OR SHORTER ONLY REQUIRE ONE BRACE. <br /> 6) LOCATION OF BOLT HOLES: C = 113D (SEE DIMENSION LOCATIONS ON <br /> DRAWING) <br /> 7) THE PLYWOOD BOARD SHOULD BE SECURED WITH SCREWS EVERY 12"ALONG <br /> THE PERIMETER OF THE FRAME OF THE WINDOW, DOOR, OR OPENING, AND <br /> WITH DECK NAILS AT EVERY 6" MARK WHERE SCREW IS NOT PLACED. <br />