My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRAVITON CONSULTING SERVICES, INC.
Clerk
>
Contracts / Agreements
>
G
>
GRAVITON CONSULTING SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 12:17:56 PM
Creation date
8/11/2025 4:34:44 PM
Metadata
Fields
Template:
Contracts
Company Name
GRAVITON CONSULTING SERVICES, INC.
Contract #
A-2025-129
Agency
Information Technology
Council Approval Date
8/5/2025
Expiration Date
6/30/2028
Insurance Exp Date
12/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A Scope of work— Graviton Consultant Agreement <br />4.2 Business Process Track <br />The activities included in the business process track will define the City's future state business processes, <br />providing the foundation upon which the CEMLI, change management, training, and project <br />management track implementation tasks are planned and executed. The business process track will <br />establish the scope of business processes to be implemented. Those business processes will be <br />configured, analyzed, and updated repeatedly through iterative formal review cycles. Multiple cycles of <br />testing will be conducted where validation of the business processes serves as the acceptance criteria <br />for the system. For Phase 2 ERP the business process track includes eight deliverables spanning the five <br />Graviton implementation stages as depicted in the graphic below. For Phase 1 HCM, Payroll Validation <br />Test serves as the ninth business process track deliverable. <br />Graphic: Business Process Track Deliverables <br />Plan Design Build Test Deploy <br />1. 8, AkIii0b [a 2 ir <br />6p Maps/lh. tlaud Business Caderepu conference Confer — System Test U.., Accepbnce Fraduct,on <br />m e_ Cw.es. processes R—Flotl Roam p0o12 Roam pilat3 iosf bupp°rt <br />The success of implementation will be measured by how effective the City transitions to the best <br />practice business processes that are native to the Oracle Cloud applications. The steps required to <br />complete this transition are at the core of the business process track. <br />4.2.1 Conference Room Pilots <br />Included in the business process track are three Conference Room Pilots, The Conference Room Pilot <br />deliverables will be critically important in determining how the Oracle Cloud modules will be configured <br />to meet the City's requirements and how the City's future state business processes will be updated. For <br />each Conference Room Pilot the project team will conduct a series of work sessions to review City use <br />cases and business processes identified during the plan and design stages. The Conference Room Pilot <br />environment will be seeded with configuration and development assigned to the corresponding CEMLI <br />Cycles. City and Graviton project team members will exercise the Oracle Cloud modules by unit testing <br />the inventory of planned use cases and business processes. From the Cloud Business Process <br />Familiarization deliverable through completion of the third Conference Room Pilot, the project team will <br />continuously revise and test use cases, business processes, and CEMLIs. At the conclusion of each <br />Conference Room Pilot, use cases and business processes will be updated to reflect City feedback and <br />decisions. Subsequent Conference Room Pilots will be planned and the required CEMLI additions and <br />updates identified. <br />Graphic: Conference Room Pilots <br />32 [GRAY�!TON <br />Y 'No SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.