My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRAVITON CONSULTING SERVICES, INC.
Clerk
>
Contracts / Agreements
>
G
>
GRAVITON CONSULTING SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 12:17:56 PM
Creation date
8/11/2025 4:34:44 PM
Metadata
Fields
Template:
Contracts
Company Name
GRAVITON CONSULTING SERVICES, INC.
Contract #
A-2025-129
Agency
Information Technology
Council Approval Date
8/5/2025
Expiration Date
6/30/2028
Insurance Exp Date
12/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit Scope of work— Graviton Consultant Agreement <br />4.3 CEMLI Track <br />The CEMLI track includes those tasks required to design, build, unit test, and deploy the oracle Cloud <br />application configuration as well as the conversion, integration, and reporting to meet the City's <br />requirements as defined by the Project Scope document. The CEMLI track includes seven deliverables <br />spanning the five implementation stages as depicted in the graphic below. <br />Graphic: CEMLI Track Deliverables <br />Plan Design Build Test Deploy <br />f <br />u CEMLI N., nrodu <br />CEMLI Cyde1 Cf ::11 [,!el CEMII Cy[k3 CEMS!cytle-0 CEMLI CydeS Cu—T <br />The wide range of application configuration and development activities to be performed during the <br />City's oracle Cloud application implementation will reside within the CEMLI track. CEMLI stands for <br />configuration, extension, modification, localization, and integration. Graviton has also added the <br />category Data Conversion. <br />4.3.1 CEMLI Categories <br />For each category of CEMLI the project team will follow Oracle Unified Method (OUM) best practices in <br />the completion of the individual CEMLls. The projectteam's implementation approach for addressing <br />each category of CEMLI is documented below. <br />I, 43 ! Gi�AI I ON <br />I CRN9—T'NH SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.