My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRAVITON CONSULTING SERVICES, INC.
Clerk
>
Contracts / Agreements
>
G
>
GRAVITON CONSULTING SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 12:17:56 PM
Creation date
8/11/2025 4:34:44 PM
Metadata
Fields
Template:
Contracts
Company Name
GRAVITON CONSULTING SERVICES, INC.
Contract #
A-2025-129
Agency
Information Technology
Council Approval Date
8/5/2025
Expiration Date
6/30/2028
Insurance Exp Date
12/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A Scope of Work — Graviton Consultant Agreement <br />4.3.2 CEMLI Cycles <br />Included in the CEMLI track are five CEMLI Cycles. CEMLI Cycles represent the method by which the <br />Graviton team will manage configuration and development for the Conference Room Pilots and test <br />cycles. For each Conference Room Pilot, the system test deliverable, and the user acceptance test <br />deliverable, the project management team will determine the configurations, extensions, integrations, <br />and conversions that must be available for the project team to conduct the unit testing of the planned <br />use cases. The required CEMLIs. will be assigned to the corresponding CEMLI cycle and managed to be <br />available in time for the Conference Room Pilot or test cycle that requires the CEMLI. The CEMLI Cycle <br />deliverables will include the completed configuration and development as well as unit testing of the <br />assigned CEMLls in a non -production environment. It is anticipated that later CEMLI cycles will address <br />the more complex CEMLI configuration and development. <br />Graphic: CEMLI Cycles <br />plan Design Build Test Deploy <br />sip 000 <br />n <br />_■ <br />o i—•I <br />m n CDREeteRce C-fele ce Cnaterenca <br />oM Not 9 Punt elOm t System Test ttSet Teft <br />UCEMLI Cycle 1 CfML! Cycle? I C€MLI Cyde 3 CEMLI CycEe3 CEMLI Cyde 5 <br />CEMLI Cycle 1 <br />CEMLI Cycle 2 <br />CEMLI Cycle 3 <br />Initial Configurations <br />Configuration Revisions <br />Configuration Revisions <br />Del iveredRe ports <br />•Initial Workflows & <br />Workflow Revisions <br />Delivered Integrations <br />Approvals <br />Application security <br />• Subset of Converted <br />Delivered Reports <br />Subset of Report <br />Data <br />Delivered Integratiors <br />Development <br />Subset of Converted <br />Subset ofCllC/PaaS <br />Data <br />Development <br />Subset of Integrations <br />Subset of Converted <br />Data <br />CEMLI Cycle 4 <br />Configuration Revisions <br />• Workflow Revis ions <br />App#ication Security <br />Revisions <br />Report Development <br />interface Development <br />oIC/PaaS Development <br />• Converted Data <br />CEMLI Cycle S <br />• Final Configuration <br />Revisions <br />• Assign User Security to <br />Users <br />Assigns Workflows to <br />Users <br />4) 51 GR�VlT01V <br />i co�vsutriHa sertvicers <br />
The URL can be used to link to this page
Your browser does not support the video tag.