My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 3.10.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 3.10.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:31:55 AM
Creation date
9/2/2025 9:29:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Resolution No. 2025-XX <br />Page 9 of 12 <br />EXHIBIT A <br /> <br />Conditions of Approval for Conditional Use Permit No. 2025-03 <br /> <br />Conditional Use Permit (“CUP”) No. 2025-03 allowing the operation of a noxious use to <br />be approved subject to compliance, to the reasonable satisfaction of the Planning Manager, <br />with applicable sections of the Santa Ana Municipal Code, the California Administrative <br />Code, the California Building Standards Code, and all other applicable regulations. <br /> <br />The Applicant must comply with each and every condition listed below in order to exercise <br />the rights conferred by this CUP. <br /> <br />The Applicant must remain in compliance with all conditions listed below throughout the life <br />of the conditional use permit. Failure to comply with each and every condition may result in <br />the revocation of the CUP. <br /> <br />1. All proposed site improvements must conform to the Development Project Review <br />(DP No. 2022-37) and the staff report exhibits. <br /> <br />2. Any proposed amendment to this CUP must be submitted to the Planning Division <br />for review. At that time, staff will determine if administrative relief is available or if the <br />CUP must be amended. <br /> <br />3. Prior to the issuance of a building permit, the Applicant shall submit a full landscape <br />and irrigation plan to the Planning Division for review and approval. The landscape <br />plan shall conform to the commercial landscape standards, Citywide Design <br />Guidelines, the City’s Water Efficient Landscape Ordinance, and the City of Santa <br />Ana Tree Species Guide (“Guide”). <br /> <br />4. Prior to the issuance of a building permit, the Applicant shall submit the recorded Lot <br />Line Adjustment illustrating the new lot line surrounding the new convenience store <br />and service station for the property at 2745 W . McFadden Avenue. <br /> <br />5. As part of the Building plan check process and prior to Building permits issuance, the <br />applicant must include a minimum of six (6) electric vehicle (EV) charging stations on <br />site. The EV charging stations may be clustered together on a single portion of the <br />site; if dispersed throughout the site, a minimum of one (1) EV charging station shall <br />be included on the portion of the site that includes the service station. All mechanical <br />equipment for the EV charging stations shall be screened from view using a <br />combination of landscaping, solid walls, and/or berming, as approved on the <br />approved landscape plans during the Building plan check process. <br /> <br />6. All landscaping shall be installed per the approved landscape and irrigation plan. In <br />addition, all landscaping along the east property line and in parking lot planters shall <br />be evergreen, be required to be maintained throughout the lifetime of the CUP, and <br />shall be required to be maintained in a healthy manner. Moreover, any unhealthy or <br />dead landscaping shall be required to be removed and replaced in-kind. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.