Laserfiche WebLink
Warner Ave. Footlab (Construction) Detailed Report, 4/4/2025 <br />5 / 31 <br />1. Basic Project Information <br />1.1. Basic Project Information <br />Data Field Value <br />Project Name Warner Ave. Footlab (Construction) <br />Construction Start Date 9/1/2025 <br />Lead Agency — <br />Land Use Scale Project/site <br />Analysis Level for Defaults County <br />Windspeed (m/s)2.50 <br />Precipitation (days)18.6 <br />Location 33.71543858302745, -117.87240998162531 <br />County Orange <br />City Santa Ana <br />Air District South Coast AQMD <br />Air Basin South Coast <br />TAZ 6820 <br />EDFZ 7 <br />Electric Utility Southern California Edison <br />Gas Utility Southern California Gas <br />App Version 2022.1.1.29 <br />1.2. Land Use Types <br />Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq <br />ft) <br />Special Landscape <br />Area (sq ft) <br />Population Description <br />Arena 0.53 1000sqft 0.01 525 0.00 ——— <br />Other Non-Asphalt <br />Surfaces <br />41.3 1000sqft 0.95 0.00 0.00 ——— <br />