Laserfiche WebLink
Warner Ave. Footlab (Construction) Detailed Report, 4/4/2025 <br />15 / 31 <br />0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Onsite <br />truck <br />Average <br />Daily <br />—————————————————— <br />Off-Roa <br />d <br />Equipm <br />ent <br />0.05 0.05 0.41 0.57 < 0.005 0.02 —0.02 0.02 —0.02 —87.6 87.6 < 0.005 < 0.005 —87.9 <br />Paving 0.03 0.03 ———————————————— <br />Onsite <br />truck <br />0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00 <br />Annual —————————————————— <br />Off-Roa <br />d <br />Equipm <br />ent <br />0.01 0.01 0.07 0.10 < 0.005 < 0.005 —< 0.005 < 0.005 —< 0.005 —14.5 14.5 < 0.005 < 0.005 —14.5 <br />Paving 0.01 0.01 ———————————————— <br />Onsite <br />truck <br />0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00 <br />Offsite —————————————————— <br />Daily, <br />Summer <br />(Max) <br />—————————————————— <br />Daily, <br />Winter <br />(Max) <br />—————————————————— <br />Worker 0.07 0.07 0.07 0.91 0.00 0.00 0.26 0.26 0.00 0.06 0.06 —248 248 < 0.005 0.01 0.02 251 <br />Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00 <br />Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00 <br />Average <br />Daily <br />—————————————————— <br />Worker < 0.005 < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 —13.8 13.8 < 0.005 < 0.005 0.02 13.9 <br />Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00 <br />Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 —0.00 0.00 0.00 0.00 0.00 0.00