Laserfiche WebLink
Warner Ave. Footlab (Construction) Detailed Report, 4/4/2025 <br />23 / 31 <br />5.4. Vehicles <br />5.4.1. Construction Vehicle Control Strategies <br />Non-applicable. No control strategies activated by user. <br />5.5. Architectural Coatings <br />Phase Name Residential Interior Area <br />Coated (sq ft) <br />Residential Exterior Area <br />Coated (sq ft) <br />Non-Residential Interior Area <br />Coated (sq ft) <br />Non-Residential Exterior Area <br />Coated (sq ft) <br />Parking Area Coated (sq ft) <br />Architectural Coating 0.00 0.00 788 263 12,509 <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (Ton of <br />Debris) <br />Acres Paved (acres) <br />Demolition 0.00 0.00 0.00 620 — <br />Site Preparation ——35.0 0.00 — <br />Landscape Median, Misc. <br />Hardscape,& Access Ramp <br />0.00 0.00 0.00 0.00 4.79 <br />5.6.2. Construction Earthmoving Control Strategies <br />Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction <br />Water Exposed Area 3 74%74% <br />Water Demolished Area 2 36%36% <br />5.7. Construction Paving <br />Land Use Area Paved (acres)% Asphalt <br />Arena 0.00 0% <br />Other Non-Asphalt Surfaces 0.95 0%