My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 4.28.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 4.28.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:47:35 AM
Creation date
9/2/2025 9:43:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum: Footlab <br />Focused Traffic Analysis <br />4 January 24, 2025 the transportation solutions company...intersections are forecast to operate at satisfactory levels of service. LOS worksheets are included in Appendix E. It should be noted <br />that with the addition of project trips, the peak hour LOS does not degrade from acceptable LOS to unacceptable LOS. <br />CONCLUSION <br />The proposed project is forecast to generate 11 trips during the a.m. peak hour and 95 trips during the p.m. peak hour. All study <br />intersections are forecast to operate at satisfactory levels of service under existing and existing plus project conditions. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.