|
<br />CITY OF SANTA ANA FY 25/26CIP
<br />CAPITAL IMPROVEMENT PROJECT WORKSHEET
<br />I
<br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED:
<br />Aꢀey Impꢁveꢂent Pꢁgꢃm This pꢀject wꢁꢂ pꢀꢃde for the removal of exisꢄng damaged
<br />pavement and reconstꢅcꢆon ꢇth Poꢈland Cement Concꢉte ꢊCC)for aꢂeꢋ cityꢗide.
<br />e Cityꢗide netꢌoꢍ of Poꢈland Cement Concꢉte ꢊCC) and asphalt
<br />aꢂeꢋ is in extꢉme state of deterioꢎꢆon ꢇth the presence ofnumeꢀus potholes, cꢎckꢏngꢐ spaꢑꢒng, and upꢓiꢔꢕgꢖ PCC pavement ꢗꢘ
<br />eꢙminate the drainage pꢀblems associated ꢇth the asphalt pavement
<br />and pꢀꢃde a longer ꢚꢛꢜ ꢝr the aꢂeꢋꢞPROJECT CATEGORY:
<br />Street Impꢁveꢂents
<br />Aꢀey Rehabiꢄtatꢅon
<br />LOCATION MAP
<br />PROJECT COSTS
<br />Construction
<br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32
<br />1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
<br />Engineering
<br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
<br />CITꢀIDE
<br />SOURCE OF FUNDS
<br />GENERAL FUND
<br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32
<br />1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
<br />M2 LOCAL FAIRSHARE
<br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
<br />AGENCY:
<br />Public ꢀꢁ
<br />DIVISION:
<br />GIP Engineeꢂng
<br />CONTACT:
<br />Jason ꢃabꢄeꢅ, ꢆꢇcꢈpaꢅ Civꢉ ꢊgineer
<br />DATE:
<br />17-Apr-2025
<br />4
|