Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />￿----------------￿ <br />PROJECT NEED:PROJECT TITLE:PROJECT DESCRIPTION: <br />B￿stol St Cor￿do￿ Regional ￿￿￿c ￿ p￿￿de inter-agency ￿￿c signal coo￿dination and ￿￿st￿ctu￿e <br />upg￿ades on B￿istol St￿eet f￿om SR-22 in the City of Santa Ana <br />th￿ough the City of Costa Mesa to Jambo￿e Road ￿ the City of <br />Ne￿o￿ Beach. ￿e p￿ject involves the Cities of Santa Ana, Costa <br />Mesa, Ne￿o￿ Beach and Ca/￿ns￿ <br />OC￿ T￿￿c Signal ￿ch￿n￿ation Maste￿ Plan identified that B￿stol <br />St￿et Co￿￿do￿ is pa￿ of countywide co￿do￿ system that needs mul￿- <br />￿u￿sdic￿on ￿￿ch￿nization￿ This p￿ect ￿￿￿ p￿￿de t￿￿c signal <br />upg￿ades and synch￿n￿e t￿a￿c signals ac￿ss￿u￿sdictional <br />bounda￿es to ￿educe t￿affic congestion and maintain the <br />s￿ch￿n￿a￿on imp￿vements fo￿ 2 yea￿s. <br />Signal ￿ch￿n￿a￿on <br />PROJECT CATEGORY: <br />￿￿￿c Imp￿￿ments <br />￿￿￿c Imp￿￿ments <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 25/26 <br />3,534,926 <br />40,000 <br />FY 26/27 FY 27/28 FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />Engineering <br />TOTAL 3,574,926 <br />SOURCE OF FUNDS <br />M2 LOCAL FAIRSHARE <br />FY 25/26 <br />200,000 <br />FY 26/27 FY 27/28 <br />MEASURE M2 COMPETITIVE 3,374,926 <br />3,574,926TOTAL <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />￿￿￿c ￿ginee￿ng <br />CONTACT: <br />Cesar Ro￿uez, Senior Civ￿ Engineer <br />DATE: <br />17-Apr-2025 <br />39