Laserfiche WebLink
FREE RECORDING PURSUANT TO <br />GOVERNMENT CODE § 27383 <br />Resolution No. 2023-XX <br />Page 5 of 11 <br /> <br /> <br />openings, at the secondary and rear facades are not readily <br />visible from the public right-of-way. <br /> <br />The project complies with Restoration Standard No. 5. <br />Distinctive materials, features, finishes, and construction <br />techniques or examples of craftsmanship that characterize <br />the restoration period will be preserved. The project will fully <br />restore the primary (west) façade and does not propose to <br />remove character-defining features or materials/finishes <br />along the primary façade. The removal of the non-compatible <br />rear addition will restore the building back to its original 1928 <br />building footprint. <br /> <br />vi. The project complies with Rehabilitation Standard No. 6. As <br />conditioned, deteriorated historic features, particularly <br />windows and doors, will be repaired rather than replaced in <br />locations where they are proposed to remain in-kind. Where <br />the severity of deterioration requires replacement of a <br />distinctive feature, the new feature will match the old in <br />design, color, texture, and where possible, material. <br />Replacement of missing features will be substantiated by the <br />original architectural plans. <br /> <br />The project complies with Restoration Standard No. 6. As <br />conditioned, all original features at the primary (west) façad e, <br />along with the leaded glass window at the north façade, and <br />original windows and doors at the secondary (north and <br />south) and rear (east) facades, will be repaired rather than <br />being replaced. Where the severity of deterioration requires <br />replacement of a distinctive feature, the new feature will match <br />the old in design, color, texture and, where possible materials, <br />based on historic photographs and original architectural <br />plans. <br /> <br />vii. The project complies with Restoration Standard No. 7. The <br />primary (west) façade will be restored based on photographic <br />evidence and architectural plans of the original, 1928 façade <br />prior to later modifications. The secondary and rear façade <br />restoration items will also be based on original architectural <br />plans. A false sense of history will not be created as no <br />conjectural features, features from other properties, or <br />combining features that never existed together historically, will <br />be undertaken. <br /> <br />viii. The project complies with Restoration Standard No. 8. <br />Chemical or physical treatments are not currently proposed <br />  <br />    <br />