My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7.9.25
Clerk
>
Agenda Packets / Staff Reports
>
Historic Resources Commission (2009-Present)
>
2025
>
Agenda Packet 7.9.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 4:21:39 PM
Creation date
9/2/2025 4:20:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />5 <br />0 <br />0 <br />9 <br />Exhibit D: Proposed Structure and Site Improvements (“Work Plan”) <br />1617 East Fourth Street <br />Item Year Improvement <br />1 2025 Repaint metal gate to side yard, located east of the residence. <br />2 2026 Repair and resurface cracked front steps and porch floor with flaked quartz <br />aggregate surface and repair cracks in grout of porch floor tile. Staff approval of <br />materials is required. <br />3 2027 Repair cracked concrete walkways and other similar surfaces throughout the <br />property; replace concrete with material of matching appearance and texture, as <br />necessary. <br />4 2027 Assess fascia and rain gutters on primary and secondary buildings and repaint, <br />repair, or replace in-kind, as necessary. <br />5 2027 Assess cracked stucco on exterior walls; repair as necessary. <br />6 2028 Replace galvanized steel water heater enclosure located at the rear of the <br />secondary building, with a compatible, stucco-clad enclosure that is designed to <br />match the materials and visual character of the building. The enclosure should <br />meet all code requirements from the Planning and Building Agency, including but <br />not limited to, California building code requirements. <br />7 2028 Repaint exterior walls of primary and secondary buildings in historically <br />appropriate color to address existing peeling, blistering, cracking, and <br />discoloration. <br />8 2030 Assess windows on primary and secondary buildings and repaint, repair, or replace <br />in-kind, as necessary. Window repair and replacement is subject to staff approval. <br />9 2031 Repair cracked surface of front porch alcove walls. <br /> <br /> <br />Historic Resources Commission 57 7/9/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.