Laserfiche WebLink
KOC systww <br />An EMCDR Company <br />• Control Panel Design — Layout Drawings, iO Drawings, Loop Drawings, BOM, i❑ List <br />• Instrument Engineering— Installation Drawings, Data Sheets <br />instrumentation submittal example is available upon request <br />• Submit Design Package to City of Santa Ana <br />5.3. Build Phase <br />• BOM Procurement <br />• Modify Screens <br />• Develop Test Scripts (FAT / SAT) <br />• Develop Detailed Commissioning Plan — this document is critical as it forces the team <br />to think though some of the issues involved in the project. Commissioning a system <br />while trying to keep your facility alive increases the difficulty by orders of <br />magnitude. Our engineers are very experienced in working with systems that need <br />to stay functioning during transitions. <br />• Supervise Fabrication of Control Panels <br />5.4. Testing and Commissioning Phase <br />• Internal Testing <br />• Factory Acceptance Test on Demo System at KDC Systems <br />• The Test Platform would be deployed for Internal Testing and FAT <br />System Startup <br />■ Site Acceptance Testing <br />Page 119 <br />KDC Systems <br />An EMCQR Company <br />