My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreement for Electrical Upgrade at the Corporate Yard
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 20 - Agreement for Electrical Upgrade at the Corporate Yard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:23:42 AM
Creation date
9/10/2025 8:37:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />BIDDER'S PROPOSAL FORM <br />ANNUAL <br />QTYr <br />UNIT <br />r r <br />5 <br />Sawcut and Remove 6" PCC <br />1 <br />60SF <br />120.75 <br />73245.00 <br />Removal of Existing Electrical 2000 AMP <br />6 <br />Panel <br />1 <br />EA <br />4,294.00 <br />Removal of 750KVA XFMR & Existing <br />7 <br />Conduits to Existing 2000 Amp Panel <br />1 <br />EA <br />7,402.00 <br />8 <br />Remove 6" Curb <br />75 <br />LF <br />53.67 <br />4,025.25 <br />9 <br />Remove Tree <br />1 <br />LS <br />3,897.50 <br />10 <br />Remove and Relocate Existing Irrigation <br />1 <br />LS <br />3,150.00 <br />5 stem <br />11 <br />Clear and Grubbing <br />500 <br />SF <br />7.74 <br />3,870.00 <br />12 <br />Install 6" Concrete Slab <br />800 <br />SF <br />40.25 <br />32,200.00 <br />13* <br />Furnish & Install 4000 Amp Panel <br />1 <br />EA <br />322,615.00 <br />14 <br />Furnish & Install 4" PVC (3 runs typical) <br />350 <br />LF <br />87.20 <br />30,520.00 <br />15 <br />Furnish & Install 5" PVC <br />10 <br />LF <br />137.712 <br />1,377.12 <br />Furnish & Install Concrete Slab Box 4'x6' & <br />All LOM Detailed Per UGS - Includes <br />EA <br />18,747.00 <br />16 <br />Removal of All Excavated Material <br />1 <br />Furnish & Install Concrete Slab Box 10'x12' <br />& All LOM Detailed Per UGS — Includes <br />EA <br />22,886.00 <br />Removal of All Excavated Material <br />17 <br />1 <br />Back fend Existing Electrical Circuit As to <br />LS <br />88,609.00 <br />18 <br />Provide Electricity to All Buildings <br />1 <br />Ground Rod Install (wl bonding) <br />LS <br />6,329.00 <br />19 <br />1 <br />Mandrel, Swab, and Proof Ducts <br />LS <br />5,326.00 <br />20 <br />1 <br />Concrete Restoration - Parking Lot <br />SF <br />67.65 <br />24,692.25 <br />21 <br />365 <br />Install Bollards <br />EA <br />1,864 <br />26,096.00 <br />22 <br />14 <br />24"x30" Cable Trench <br />LF <br />1,334 <br />26,680.00 <br />23 <br />20 <br />As-Builts & Closeout Documentation <br />LS <br />12,148.00 <br />24 <br />1 <br />25 <br />Environmental Controls (BMPs) <br />1 <br />LS <br />17,011.00 <br />City of Santa Ana IFB No. 25-075 Page 24 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.