My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAB SERVICES <br />The David Dixon Memorial Materials Laboratory (LAB) provides the following services: <br />1. Geotechnical engineering, engineering geology, pavement analysis, and foundation <br />investigations for COUNTY facilities <br />2. Evaluation and acceptance of mix designs including asphalt concrete (AC) mix design, <br />Portland cement concrete (PCC) mix design, cement treated soils, and soil stabilization mix <br />designs, for all COUNTY projects, subdivision infrastructure and COUNTY property <br />encroachment permits <br />I Quality assurance testing on construction materials including aggregates, AC, PCC, and soils <br />for all COUNTY projects, subdivision infrastructure, and COUNTY property <br />encroachment permits <br />4. Acceptance and quality assurance testing as described above for Cities under contract with <br />the County through OC Public Works <br />Page 5 of 25 Quality Assurance Plan 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.