My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTING GUIDELINES <br />ACCEPTANCE TESTING (AT) <br />AT shall be performed by LAB personnel who are certified to perform the required tests. Test results <br />shall be used to ensure that all materials incorporated into the project are in compliance with the <br />contract specifications. <br />Testing methods will be in accordance with the Caltrans, AASHTO, or ASTM test methods, as <br />specified in the contract specifications. <br />Sample locations and frequencies shall be in accordance with the contract specifications. If not <br />specified in the contract specifications, samples shall be taken at the locations and frequencies as <br />shown in Appendix IV, "Acceptance Sampling and Testing Frequencies". <br />INDEPENDENT ASSURANCE PROGRAM (IAP) <br />IAP will be used to verify that acceptance testing is being performed correctly by qualified testers and <br />laboratories. These include, but are not limited to: <br />1. Verifying that equipment used for acceptance testing is properly calibrated and in good <br />working condition. Records of equipment calibrations should be kept with the equipment. <br />2. Certifying acceptance testers by administering written and practical/witness exams for the <br />acceptance tester. <br />3. Performing corroboration testing between the acceptance tester and independent assurance <br />personnel on Sieve Analysis, Sand Equivalent, and Cleanness Value tests. <br />4. A written procedure for dispute resolution <br />IAP shall be provided by personnel from Caltrans, the Agency's certified materials laboratory, or <br />consultant's certified materials laboratory. <br />For Federal -aid projects off the NHS, the agency may choose to: <br />1. Hire an outside qualified consultant to perform IA services, or <br />2. Have a qualified employee from within the local agency to perform IA services, or <br />3. Request Caltrans provide IA services if California Test Methods are used. <br />IAP personnel shall be certified in all required testing procedures, as part of IAP. <br />Poor correlation between acceptance tester's results and other test results may indicate probable <br />deficiencies with the acceptance sampling and testing procedures. In cases of unresolved <br />Page 9 of 25 Quality Assurance Plan 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.