My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX III <br />EXAMPLE OF TEST RESULT <br />COUNTY OF ORANGE <br />❑C PUBLIC WORKS <br />DAVID DIXON MEMORIAL MATERIALS LABORATORY <br />TEST METHOD; CTM 216 <br />REPORT OF TESTS ON <br />PAGE T OF 1 <br />THE RELATIVE COMPACTION OF <br />DATE TESTED: N3112015 <br />REQUIRED RC- 90 <br />IMPORT -SAND <br />AM <br />PROJECT NAME• NEWLAND STORM <br />CHANNEL <br />CHARGE- EF07404 <br />AGENCY; GC PUBLIC WORKS <br />INSPECTOR: TGMMY NGUYEN <br />CONTRACTOR: KEC <br />USE STRUCTURE BACKFILL <br />PLANT; BNI • CORONA <br />TESTED BY KEVIN NGUYEN. <br />NUCLEAR GAUGE MODEL 34W (CTM 231) <br />DENSITY STD COUNT 2414 <br />GAUGE SERIAL 0:70004 <br />MOISTURE $TO COUNT 697 <br />LABS STREETI <br />STATION/ <br />ELEVATION DEPTH VVIPO DIPD %H2O <br />WIMD DIMD OPT %RC RETE$T <br />LOCATION <br />OFFSET <br />15-C-2455 NEWLAND S6 <br />47+7QIC4 <br />4'BTW S' 128.4 1112 7A <br />134.9 t1 UN 95 <br />TRENCH <br />FIELD TIME <br />AT S = <br />ONE MOLD (CAL 216) <br />AT S = <br />WET CURVE (CAL 216) <br />AT $ _ <br />DRY CURVE (CAL 216) <br />AT S <br />ASTM 1557 (AA$HTO) <br />OTHER <br />AT S <br />AT <br />BY <br />END OF MONTH TOTAL 5 <br />BILLING <br />,d.�-, Sr- CAI E gim, <br />G� <br />Page 19 of 25 Quality Assurance Plan 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.