My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 MITIGATION MONITORING AND REPORTING PROGRAM <br />Regulatory Requirements/Mitigation Measures <br />Timing <br />Responsible <br />Monitoring <br />Signature/Date <br />Party <br />Party <br />of Compliance <br />ENERGY <br />RR E-1 <br />Construction activities will be conducted in <br />During <br />Project <br />City of Santa Ana <br />compliance with California Code of Regulations <br />construction <br />Applicant/ <br />Building Safety <br />Section 2485, which requires that nonessential <br />Construction <br />Division <br />idling of construction equipment be restricted to five <br />Contractor <br />minutes or less. <br />RR E-2 <br />At least 65 percent of all nonhazardous <br />During <br />Project <br />City of Santa Ana <br />construction and demolition waste from <br />construction <br />Applicant/ <br />Building Safety <br />nonresidential construction associated with future <br />Construction <br />Division <br />development in the plan area shall be recycled <br />Contractor <br />and/or salvaged for reuse in line with the 2016 <br />California Green Building Standards Code Section <br />5.408 (California Code of Regulations, Title 24, <br />Part 11). <br />RR E-3 <br />New buildings implemented as part of the General <br />Prior to the <br />Property Owner <br />City of Santa <br />Plan Update are required to achieve the current <br />issuance of <br />or Project <br />Ana Planning <br />California Building Energy and Efficiency <br />occupancy <br />Applicant <br />Division <br />Standards (California Code of Regulations, Title <br />permits <br />24, Part 6) and California Green Building <br />Standards Code (California Code of Regulations, <br />Title 24, Part 11). <br />RR E-4 <br />Any appliances associated with development in the <br />Prior to the <br />Property Owner <br />City of Santa <br />Plan Area shall meet the requirements of the 2012 <br />issuance of <br />or Project <br />Ana Planning <br />Appliance Efficiency Regulations. <br />occupancy <br />Applicant <br />Division <br />permits <br />RR E-5 <br />Development under the General Plan Update shall <br />Prior to <br />Project <br />City of Santa <br />support the goals of the renewables portfolio <br />discretionary <br />Applicant <br />Ana Planning <br />standard, SB 350, and SB 100 to achieve a tiered <br />approval <br />Division <br />increase in the use of renewable energy to 60 <br />percent by 2030, and 100 percent by 2045. <br />RR E-7 <br />Development under the General Plan Update shall <br />Prior to <br />Project <br />City of Santa <br />be in compliance with state and local solid waste <br />discretionary <br />Applicant <br />Ana Planning <br />regulations including AB 939, AB 341, AB 1327, AB <br />approval <br />Division <br />1826, and Section 5.408 of 2016 California Green <br />City of Santa Ana <br />August 2025 <br />4-9 <br />The Village Santa Ana Specific Plan Project <br />Final Supplemental Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.