My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 NO ENVIRONMENTAL EFFECTS AND LESS THAN SIGNIFICANT <br />ENVIRONMENTAL EFFECTS WITHOUT MITIGATION MEASURES <br />Explanation of the Rationale: Construction of the Project would generate a total of <br />approximately 17,846 tons over the course of a 20-year period, a large percentage of which would <br />occur during phase one, which includes demolition of the existing uses at the Project site. All <br />future construction activities would be required to demonstrate compliance with Assembly Bill <br />(AB) 939, which requires that at least 50 percent of waste produced is recycled, reduced, or <br />composted. In addition, the project would be constructed in accordance with CALGreen, which <br />requires recycling a minimum of 65 percent of the nonhazardous construction and demolition <br />debris, and submittal of a construction waste management plan. Compliance with these <br />regulations, as well as RR U-7 requiring implementation of a construction waste management <br />plan, would ensure the project's construction -related solid waste impacts would be less than <br />significant. <br />Operation of the Project would generate a total of approximately 35,700 pounds per day, or 17.85 <br />tons per day (tpd). The maximum permitted capacity for the Frank Bowerman Sanitary Landfill <br />and the Olinda Alpha Landfill are 11,500 tpd and 8,000 tpd, respectively. Both landfills have an <br />average daily disposal rate of approximately 7,000 tpd, indicating that they would have sufficient <br />capacity to accommodate the Project's 17.85 tpd of solid waste (i.e., less than 1 percent of the <br />residual disposal capacity of the Frank Bowerman Sanitary Landfill). The Project would also be <br />required to comply with RR U-8, which states that all development pursuant to the GPU would be <br />required to store and collect recyclable materials and green waste in accordance with AB 341 and <br />AB 1826. Additionally, the Project would implement GPU policies to incorporate recycling and <br />organics collection activities to align with state waste reduction goals. Therefore, the Project would <br />not generate solid waste in excess of state or local standards, or in excess of the capacity of local <br />infrastructure. Impacts would be less than significant. (Draft Supplemental EIR, <br />pp. 4.15-31 — 4.15-33.) <br />Threshold U-5: The Project would comply with federal, state, and local management and <br />reduction statutes and regulations related to solid waste. <br />Findings: The City finds that the Project would result in less -than -significant impacts to utilities <br />and service systems related to compliance with solid waste federal, state, and local management <br />and reduction statutes and regulations. Additionally, the City finds that the Project will implement <br />regulatory requirements RR U-7 through RR U-8 (listed above). (Draft Supplemental EIR, <br />p. 4.15-34.) <br />Explanation of the Rationale: Construction of the Project would be required to comply with the <br />requirements of AB 939, which requires that at least 50 percent of waste produced is recycled, <br />reduced, or composted, and CALGreen, which requires recycling a minimum of 65 percent of the <br />nonhazardous construction and demolition debris and submittal of a construction waste <br />management plan. Operation of the Project would also be required to comply with AB 939; AB <br />341, which requires diversion of a minimum of 75 percent of operational solid waste; and Chapter <br />16 Article II of the City's Municipal Code, which incorporates the waste requirements of SB 1383 <br />for single-family, multi -family, and commercial uses. Additionally, the Project would implement <br />waste disposal services to allow for trash, recycling, and food waste for all residential and <br />commercial uses. Therefore, the Project would comply with applicable state and local regulations <br />related to solid waste. Impacts would be less than significant. (Draft Supplemental EIR, <br />pp. 4.15-31 — 4.15-33.) <br />City of Santa Ana The Village Santa Ana Specific Plan Project <br />August 2025 CEQA Findings of Fact and Statement of Overriding Considerations <br />4-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.