My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence - Item 28
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Correspondence - Item 28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2025 7:41:18 AM
Creation date
9/10/2025 10:11:44 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1(Cont.) <br /> Lawn and Landscaping <br /> ENERGY EFFICIENCY IMPROVEMENTS 0 W-1 Use Reclaimed hbn-Phrahk Waver Q ll•l Regime Gas Powered Landscape Equrpmem 0 5-1 Insieute or Extend ReMling <br /> Q E•1-Buildings Exceed 2D19 Title 24 Building Envelope Energy Q W-2.Use Grey Wdor *nth iero•EmnsRan Landscape Equipment Services <br /> FfficienryStandards 0 W-3 Use Locality 5fevell Wow Suppty O S-2ImplemerniOrganirs <br /> d E•2-Require Energy EFkdem Appliances Diversion Program <br /> Q W-4.Requre Low.Flow Mfeter fixture <br /> Q E-3-A.Require Energy Efficient Residential$oilers 0 W-5,Design Warier•Efficieni Landscapes 0 S-3 Require Edible FDod <br /> © E-3-B-Require Energy Efficient(ommotod Pocko red Boiler Recovery Progrom Partnerships <br /> Q, W.S Reduce furl in Landscapes and Lawns <br /> with Food Generators <br /> * E4.Install Coal Rods andlor Cod Walls in Residential Development <br /> O W•7 Adopt o Waver(anservcnrOft 5traregy <br /> 0 E.5-Install Green Rosh in Place of Dark Roofs <br /> 0 E4 Encourage Residential Patuaperrae in Existing Demand <br /> Response Program(s) <br /> 0 E-7 Require Nigher Elfitacy Public Srreer and Area Lighting Natural and Working • o o Construction <br /> 0 E-ff Replace Incondesttnt Traff c Lights with LED traffic L ghn <br /> 0 E•9-Utilize a Combined Heat and Porter System Q N-1.(rears flew Vegetated Open Space 0 C.1-k.Use Ek it or Hybrid Powered Egwpment <br /> Q E•21,Instal]Caul Perement 0 N-2 Expand Ur bun Tree Planting 0 C-1-8 UseCeener-Fuel Equlpnnem <br /> RENEWABLE ENERGY GENERATION © N-3-implement Menagemenl Practices to Improve 1heHechfl 0 C-2.Llmh Heavy-bury EAese1 Whide Idling <br /> • E.104.Establish Onsste Renewable Energy Systems Genetic and Furx>ron of Natural and Working Lands 0 C-3.Use Local foastinrcrioe Conhaaars <br /> • E-I".Eualrirsh Onum Renexelile Energy Power O N-4,Require W Monogemenr Practices for Alma re Management <br /> 0 E-ID-C.Establish Ons se RenewableEoergy Systems—Wind Power O N-7 Wildfire Resilierxe and Alonogemenfi <br /> a E•11 Prmure EWrrcrty from Lower Carbon Inte"Power Supply a N-g.Agricultural Equ+pmem fHiciency <br /> 0 E•26.Biomass Energy <br /> BUILDING DECARBONIZATION Refrigerants Miscellaneous <br /> 0 E.12 Install Alternative"of Water Hearer in Plane of Gas IF <br /> Star op Tank Healer in Residences <br /> Cj E•13 ImraR Eleatic Ranges m Pfau of Gas Ranges 0 R-I.Use Afeernarire Refrigeranri Instead of High-GWP Refrigerants O M-1 Esrohlis6 a Carbon Sequestration Progert <br /> 0 E•14.Limit Wood B Roanim in Piece of as R of Go tie 0 R'2.Install Secondory Loop andlor Cauade Supermatker Srstems in 0 M-2 Establish Off m Mitigation <br /> 9 Po Platt of D+red Expansion Systems C] M-3.Im temenl an Innovatare Strategy far GNG Alrt os,on <br /> Fireplaces m Res iden ial Development P gl r9 <br /> C1 R 3.-GWI'Tifor rititol[CIr Supermarket Systems in PUare of M-6.Off-Road Equipment Effaian <br /> C] E-15 Require All-ElerMirDr�relopmera High•GWPSystec� 0 ' ry <br /> Q E-16 Require Zero Nor Energy Bull drngS 0 R-4.Install lticrachannel Had Exdwrsgon in W Equipment in Flare <br /> 0 E-17 Require Renewable-Surplus Buildings ol(onvennonal Heat Exchanger <br /> D R-5.Reduce Service leak Emissions <br /> METHANE RECOVERY <br /> 0 R-6.Reduce Opaotional Leak Emissions <br /> 0 E•1B Establish Mdtiane Recovery in Lon dfil6 Q R 7-Reduce Disposal Emissions <br /> 0 E•19.Establish Meifsone Recovery in Wastewater Treatment Plants <br />
The URL can be used to link to this page
Your browser does not support the video tag.